Skip to main content
CityRuleLookup

Dade City, FL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
Code § 42-252(a)
Adopted
Ord. No. 99-0743, October 26, 1999
Core duty
Retain sediment onsite, meet NPDES/state permit
Notice required
Before discharging from industrial/construction sites
Enforcement
City manager, written notice + corrective plan
Serious risk
Cease-and-desist order by registered mail

Summary

Dade City, Pasco County, Florida, requires construction sites to control stormwater so sediment stays onsite and state water quality standards are not violated, under Code § 42-252(a), tying compliance to whatever NPDES or state stormwater permit already governs the site.

(a)Stormwater from construction sites shall be controlled in such a way as to retain sediment onsite and prevent violations of state water quality standards, or NPDES permits. All erosion, pollution, and sediment controls required pursuant to the pollution prevention plan of a NPDES stormwater permit for construction or required pursuant to a state stormwater permit issued by either the state department of environmental regulation or the Southwest Florida Water Management District shall be properly implemented, maintained and operated.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 18 | Land Development Regulations: Supplement 1).

Full Breakdown

Section 42-252(a) of the Dade City Code of Ordinances, part of the city's stormwater management article adopted by Ord. No. 99-0743 on October 26, 1999, requires that stormwater from construction sites be controlled so as to retain sediment onsite and prevent violations of state water quality standards or NPDES permits. Rather than setting its own separate numeric erosion table, the section incorporates whatever erosion, pollution and sediment controls are already required under the pollution prevention plan of a site's NPDES construction stormwater permit, or under a state stormwater permit issued by the state department of environmental regulation or the Southwest Florida Water Management District, and requires that those controls be properly implemented, maintained and operated throughout construction.

Section 42-252(c) separately requires owners or operators of industrial facilities or construction sites discharging stormwater to the city's municipal separate storm sewer system to give the city written notice before discharging. Administration runs through the city manager under § 42-225: a violation triggers a written notification requiring the responsible party to propose corrective measures and a completion schedule, subject to the city manager's approval, and the city manager can issue a cease-and-desist order by registered mail if the situation could seriously affect public health, safety or the environment, or if irreversible harm could result.

Prosecution follows the general penalty in § 1-7, and a violator responsible for a discharge that harms a receiving water is also liable for sampling, analytical costs, any state or federal fines, and the cost of restoring the water.

Violations & Fines

A construction site found to be violating § 42-252(a) receives written notification from the city manager under § 42-225 requiring a corrective action plan and schedule. Serious risk to health, safety or the environment can bring an immediate cease-and-desist order by registered mail. Violators face prosecution under § 1-7, plus liability for sampling costs, any state or federal fines, and full restoration costs for any receiving water harmed.

Frequently Asked Questions

Does Dade City have its own erosion control numbers for construction sites?
No separate numeric table. Code § 42-252(a) instead requires builders to follow whatever erosion, sediment and pollution controls their NPDES construction stormwater permit or state stormwater permit from the Southwest Florida Water Management District already sets, and to keep those controls properly maintained.
Who enforces stormwater rules on a Dade City construction site?
The city manager administers the article under § 42-225, issuing written notices requiring a corrective action plan and schedule, and can issue a cease-and-desist order by registered mail if the violation seriously threatens public health, safety or the environment.
Do I need to notify the city before a construction site discharges stormwater?
Yes. Section 42-252(c) requires owners or operators of construction sites and industrial facilities discharging to the city's storm sewer system to give the city written notice before that discharge begins.
What can it cost me if my construction site's runoff damages a waterway?
Beyond prosecution under § 1-7, § 42-225(d) makes a violator liable for the city's sampling and analytical costs, any state or federal fines from the discharge, and the full cost of restoring the receiving water to its prior condition.

Sources & Official References

Other rules in Dade City

All Dade City rules

Florida rules heatmap·Compare Dade City to another location·View the Florida environmental rules overview

Get notified when Erosion Control in Dade City, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Pasco County handle erosion control.

New Port Richey, FL
Some Restrictions