North Port, FL Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing code
ULDC § 4.4.1.E(7)-(8)
Applies to
One-and-two-family building permits
Minimum survey points
Ten existing grades, NGVD29/NAVD88 datum
Swale design storm
10-year, 24-hour storm capacity
Escalation trigger
Adverse drainage effect on adjacent lot

Summary

New one-and-two-family development in North Port must submit a site and drainage plan showing existing grades, swale routing, and positive drainage from rear to front before the city issues a building permit.

Site and Drainage Plan Requirements. The site and drainage plan shall include, at a minimum, the following existing conditions: ...g. Stormwater runoff must drain from the rear lot line to the front drainage swale, except when the property is bound by a City-maintained drainage right-of-way. If the property is bound by a City-maintained drainage right-of-way, runoff will be allowed into those facilities. ...k. Slopes shall not exceed three (3) to one (1) (horizontal to vertical).

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of the City: Supplement 65 | Unified Land Development Code: Supplement 22).

Full Breakdown

North Port's Unified Land Development Code requires every one-and-two-family building permit application to include a site and drainage plan under ULDC § 4.4.1.E(7). The plan must show at least ten existing grades tied to NGVD29 or NAVD88, the front-yard roadside swale, side and rear outfall ditches, and proposed first-floor elevations. Stormwater must drain from the rear lot line to the front swale, with arrows demonstrating positive drainage and no adverse effect on adjacent lots. If city review finds adverse drainage effects on a neighboring lot, § 4.4.1.E(8) escalates the requirement to a sealed topographic survey and an engineered drainage plan from a Florida-licensed surveyor and professional engineer.

Violations & Fines

Building permits are withheld until the site and drainage plan meets § 4.4.1.E(7); the Public Works Department can require a sealed engineered resubmittal under § 4.4.1.E(8) if drainage would harm adjoining lots.

Frequently Asked Questions

Does North Port require a drainage plan for a new house?
Yes. ULDC § 4.4.1.E(7) requires a site and drainage plan with existing grades, swale routing, and proposed first-floor elevation before the city issues a one-and-two-family building permit.
What if my lot's drainage plan would flood a neighbor?
Under § 4.4.1.E(8), the city can require a sealed topographic survey and an engineered drainage plan from a Florida-licensed surveyor and professional engineer before approving the permit.

Sources & Official References

Other rules in North Port

All North Port rules

Florida rules heatmap·Compare North Port to another location·View the Florida environmental rules overview

Get notified when Erosion Control in North Port, FL changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Sarasota County handle erosion control.

Sarasota, FL
Some Restrictions