Ascension Parish, LA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Governing section
UDC § 17-509
SWPPP required
sites disturbing over 1 acre
Small-site report
SCACR within 60 days (LAR200000)
Large-site report
Notice of Termination (LAR100000)
Major stream slope max
3:1, or 1.5:1 if concrete-lined
Detention pond slope max
3:1 to 2 ft below normal pool

Summary

In unincorporated Ascension Parish, any development must have an erosion/sedimentation control (ESC) plan prepared by the project Engineer and approved by the Office of Planning and Development before work begins, under UDC Section 17-509. Sites disturbing more than one acre must also file a state storm water pollution prevention plan (SWPPP) with the parish Engineering Department under Louisiana's LPDES permit program.

These county ordinances apply to unincorporated areas of Ascension Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

A.An erosion/sedimentation control (ESC) plan shall be developed by the Engineer and submitted for approval to address potential sediment migration from the project site during construction activities. It will be the responsibility of the Contractor to maintain drainage ditches and detention ponds and to provide adequate bank stability and erosion protection until the site is fully stabilized. ... B.As per LPDES requirements, a storm water pollution prevention plan (SWPPP) shall be developed for all sites that disturb greater than one acre. ... All of these sites will be covered under general permit LAR100000 or LAR200000. ... E.The following shall be considered as maximum slopes that provide adequate bank stability and erosion protection:1.Major streams: Maximum slope shall be 3:1 (horizontal to vertical). If the slopes are concrete lined, a slope of 1.5:1 may be utilized.

Full Breakdown

Section 17-509 of the Ascension Parish Unified Land Development Code makes the project Engineer responsible for producing an ESC plan addressing sediment migration off the construction site, and makes the Contractor responsible for maintaining drainage ditches and detention ponds and providing bank stability and erosion protection until the site is fully stabilized. Any site that disturbs more than one acre must also carry a Louisiana Pollutant Discharge Elimination System (LPDES) storm water pollution prevention plan (SWPPP), filed with the Ascension Parish Engineering Department before construction starts and covered under general permit LAR100000 (over five acres) or LAR200000 (small construction).

The applicant deals directly with the Louisiana Department of Environmental Quality for permit specifics. Sites under LAR200000 must submit a small construction activity completion report within 60 days of finishing covered work, with a copy to the parish; sites under LAR100000 must file a notice of termination once the site is finally stabilized, also copied to the parish, and both permits require periodic inspection reports to the Ascension Parish Storm Water Department at the frequency set in the SWPPP. 5:1 if concrete-lined; storm water detention ponds are capped at 3:1 down to two feet below normal pool, steeper only with a licensed geotechnical engineer's stability certification; and open ditches are capped at 3:1. Where a ditch discharges into an outfall channel, it must be enclosed in a properly sized pipe approved by the Department of Public Works.

Violations & Fines

The parish enforces this through the plan-approval and permitting process rather than a stated fine in this section: an ESC plan must clear the Office of Planning and Development before a development permit issues, and a required SWPPP must be on file with the Engineering Department before construction starts. Contractors who fail to maintain ditches, detention ponds, or bank stability until a site is stabilized are out of compliance with Section 17-509(A), and sites that miss the SCACR (60-day) or NOT filing deadlines are out of compliance with their LPDES permit as well as parish requirements.

Frequently Asked Questions

Who has to file an erosion control plan in Ascension Parish?
Any developer or contractor undertaking development in unincorporated Ascension Parish, defined broadly to include subdivisions, new commercial or multi-residential buildings, and land-clearing or grading, must have an Engineer-prepared ESC plan approved by the Office of Planning and Development under UDC Section 17-509 before construction begins.
When does a project need a SWPPP in Ascension Parish?
Any site that disturbs more than one acre needs a storm water pollution prevention plan filed with the parish Engineering Department under Louisiana's LPDES general permit LAR100000 (over five acres) or LAR200000 (smaller sites), per UDC Section 17-509(B), before construction starts.
What slope limits apply to ditches and ponds in Ascension Parish?
UDC Section 17-509(E) caps major stream slopes at 3:1 (1.5:1 if concrete-lined), storm water detention pond side slopes at 3:1 down to two feet below normal pool water level, and open ditch slopes at 3:1, unless a licensed geotechnical engineer certifies a steeper slope is permanently stable.

Sources & Official References

Other rules in Ascension Parish

All Ascension Parish rules

Compare Ascension Parish to another location·View the Louisiana environmental rules overview

Get notified when Erosion Control in Ascension Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.