Santa Clarita, CA Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Governing chapter
SCMC Chapter 10.04, Stormwater and Runoff Pollution Control
Trigger
Applying for any grading or building permit
Required proof
NOI and SWPPP kept on site during construction
Erosion BMPs
Wet-season grading limits, rain inspections, slope covering
Concrete washout
Banned citywide except a City-designated wash area
Penalty
Misdemeanor under Section 10.04.080
Enforcement
Administrator issues notices of violation, Section 10.04.090

Summary

Santa Clarita requires proof of a filed stormwater Notice of Intent and a completed Stormwater Pollution Prevention Plan before it issues a grading or building permit on projects that trigger the state construction permit. Municipal Code Section 10.04.070 also forces smaller sites to retain sediment on site and control slope erosion with BMPs, backed by misdemeanor penalties.

Each person applying to the City for a grading or building permit, for projects for which compliance with regulations governing State Construction Activity Stormwater Permits ("GCASPs") is required, must submit satisfactory proof to City (i) that a notice of intent (NOI) to comply with the GCASP has been filed and (ii) that a stormwater pollution prevention plan has been prepared before the City shall issue any grading or building permit on the construction project. ... Each person applying for a grading or building permit for any project for which compliance with regulations governing State Construction Activity Stormwater Permits is not required shall submit to the City for information, and shall implement a grading and construction activity runoff control program adequate to accomplish all of the following: ... 4. Control erosion from slopes and channels through use of effective BMPs, such as limitation of grading during the wet season, inspection of graded areas during rain events; planting and maintenance of vegetation on slopes, if any, and covering any slopes susceptible to erosion.

Full Breakdown

04, the stormwater and urban runoff pollution control ordinance, sets the local erosion and sediment control rules for construction sites. Before the City issues any grading or building permit on a project that triggers the state's General Construction Activity Stormwater Permit (GCASP), the applicant must show the City a filed Notice of Intent to comply with the GCASP and a completed Stormwater Pollution Prevention Plan (SWPPP); copies of both documents must stay on site through grading and construction so any City inspector can review and copy them on request.

070(C) still requires a grading and construction activity runoff control program that retains sediment on site with treatment or structural BMPs, keeps construction materials and spills from reaching streets, drains, the storm drain system or neighboring properties, contains non-stormwater runoff from equipment and vehicle washing on site, and controls erosion from graded slopes and channels through measures such as limiting grading during the wet season, inspecting graded areas during rain events, planting and maintaining slope vegetation, and covering slopes prone to erosion. 070(F)). 090.

Violations & Fines

Section 10.04.080 makes any violation of Chapter 10.04, of an approved SWPPP, of a stormwater permit condition, or of an administrative order issued under the chapter a misdemeanor. The Administrator can issue a notice of violation or an administrative order under Section 10.04.090 to force compliance on the site, and failing to comply with that order is itself a separate, additional violation of the chapter.

Frequently Asked Questions

Does Santa Clarita require a SWPPP for construction projects?
Yes, if the project needs a state General Construction Activity Stormwater Permit, Section 10.04.070(A) requires the applicant to submit proof of a filed Notice of Intent and a completed SWPPP before the City issues a grading or building permit, and to keep both documents on the job site for inspectors to review throughout construction.
What erosion control measures does the code require on graded slopes?
Section 10.04.070(C)(4) requires builders to control erosion from slopes and channels with effective BMPs, including limiting grading during the wet season, inspecting graded areas during rain events, planting and maintaining slope vegetation, and covering slopes that are susceptible to erosion.
Can I wash out a concrete truck on a Santa Clarita job site?
No. Section 10.04.070(F) prohibits washing any concrete truck, chute, pump or tool anywhere in the City except an area the City has specifically designated for that purpose, and bars letting rinse water reach any drain, ditch, street or part of the storm drain system.
What happens if a contractor violates the erosion control rules?
Section 10.04.080 makes any violation of Chapter 10.04, an approved SWPPP, or an administrative order a misdemeanor, and the City's Administrator can issue notices of violation or administrative orders under Section 10.04.090 to force immediate compliance on the site.

Sources & Official References

Other rules in Santa Clarita

All Santa Clarita rules

California rules heatmap·Compare Santa Clarita to another location·View the California environmental rules overview

Get notified when Erosion Control in Santa Clarita, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Los Angeles County handle erosion control.

Carson, CA
Some Restrictions
West Covina, CA
Some Restrictions
El Monte, CA
Some Restrictions
Inglewood, CA
Some Restrictions
Santa Monica, CA
Some Restrictions
South Gate, CA
Some Restrictions
Palmdale, CA
Some Restrictions
Pomona, CA
Some Restrictions