Skip to main content
CityRuleLookup

Cameron County, TX Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Minimum requirement
Erosion Control Plan for all sites
1+ acre disturbed
Storm Water Pollution Prevention Plan required
10+ acres disturbed
Sediment basin required
5+ acres disturbed
Copies of state construction-site permits required
Governing order
County Order No. 201105032

Summary

Any site development permit in unincorporated Cameron County requires an erosion control plan at minimum, and projects disturbing an acre or more must file a Storm Water Pollution Prevention Plan. Disturbing 10 acres or more triggers a sediment basin requirement, and 5 acres or more requires copies of state permits.

City-specific rules exist: Brownsville has its own erosion control rules that differ from Cameron County's county-level regulations. If you live in Brownsville, check the city-specific page instead.

III. Erosion Control Requirements ORDER NO 201105032 Provide erosion control requirements. This should include, but is not limited to the following items: 1. Site development Permit - Erosion Control Plan (minimal requirement for all sites) 2. ... Storm Water Pollution Prevention Plan (1 acre or more, follow template below.) ... Sediment Basin for disturbance of 10 acres or more ... Copies of permits (5 acres or more) Primary and Secondary Large Construction Site Notices, Copy of NOI(s) for Primary and Secondary Operators, Signed "Delegation of Authority", if applicable.

Full Breakdown

Appendix C of the county's Flood Damage Prevention and Building Regulations, tied to County Order No. 201105032, lays out the erosion control package every site development permit application has to include. At a minimum, every site needs a Site Development Permit Erosion Control Plan, covering a natural resources map at a scale no smaller than 1 inch to 100 feet identifying soils, forest cover and protected resources, a construction timeline showing when clearing starts and how long cleared ground stays exposed, the specific erosion and sediment control measures used through every phase of construction and after the site is finished, seeding mixtures and mulching methods for temporary and permanent vegetative cover, and who maintains the control facilities once installed.

Projects disturbing one acre or more step up to a full Storm Water Pollution Prevention Plan following the state's Construction General Permit template, describing the construction activity, potential pollutants, drainage patterns, nearby surface waters, and the best management practices used to keep runoff clean. Disturbing 10 acres or more adds a sediment basin requirement, and any project disturbing 5 acres or more has to submit copies of its state permits, including the primary and secondary large-construction-site notices and the Notice of Intent for each operator, before the county will sign off.

Violations & Fines

Cameron County's checklist ties the erosion control plan, and where applicable the Storm Water Pollution Prevention Plan and sediment basin, directly to the site development permit under Order No. 201105032, so a project that clears or grades land without the required plan on file has not met its permit conditions. That failure exposes the developer to the same permit-violation enforcement the county applies countywide, including fines under Article 4, Section J.5 and contempt of the Commissioners Court under Section K.

Frequently Asked Questions

Does Cameron County require an erosion control plan for site development?
Yes. Appendix C of the county's Flood Damage Prevention and Building Regulations, adopted under Order No. 201105032, makes a Site Development Permit Erosion Control Plan the minimum requirement for every site seeking a site development permit, including a natural resources map, a construction timeline, and the specific sediment control measures used.
When does a Cameron County project need a full Storm Water Pollution Prevention Plan?
Once a project disturbs one acre or more of land, it needs a Storm Water Pollution Prevention Plan following the state Construction General Permit template, per the erosion control checklist in Appendix C. Disturbing 10 acres or more adds a sediment basin, and 5 acres or more requires copies of the filed state permits.
What triggers a sediment basin requirement in unincorporated Cameron County?
Disturbing 10 acres or more of land on a site development project triggers the sediment basin requirement in the county's Appendix C erosion control checklist under Order No. 201105032. Smaller disturbances of an acre or more still need a full Storm Water Pollution Prevention Plan instead.

Sources & Official References

Other rules in Cameron County

All Cameron County rules

Texas rules heatmap·Compare Cameron County to another location·View the Texas environmental rules overview

Get notified when Erosion Control in Cameron County, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Cameron County