Walla Walla County, WA Environmental Rules: Erosion Control (2026)
Key Facts
- SWPPP trigger
- 1 acre or more disturbed
- Common-plan sites
- smaller phases still count
- Plan basis
- SMMEW Chapters 3 and 7
- Additional permit
- state construction stormwater general permit
- Erosivity waiver window
- 1-5 acres, June 15-Oct 15
- Enforcing official
- county engineer, under WWCC 14.13
Summary
Construction sites in unincorporated Walla Walla County disturbing an acre or more, including smaller sites that are part of a larger common plan, must submit a stormwater site plan and pollution prevention plan (SWPPP) under WWCC 11.07.030(C) and obtain the state's construction stormwater general permit. Operators must select and maintain erosion and sediment control best management practices that meet the state's Stormwater Management Manual for Eastern Washington.
C.Construction Site Runoff Control.1.Construction sites disturbing greater than or equal to one acre, including construction sites of less than one acre that are part of a common plan of development or sale that is greater than one acre, shall prepare a stormwater site plan and stormwater pollution prevention plan (SWPPP) in accordance with Chapters 3 and 7 of the SMMEW.a.Construction operators shall provide erosion and sediment control BMPs and implement source control BMPs during construction to protect water quality, reduce discharge of pollutants, and satisfy state AKART requirements. Erosion and sediment control BMPs and source control BMPs shall be selected, designed, installed, operated and maintained in accordance with the standards in the SMMEW. ... 2.Construction sites disturbing greater than or equal to one acre, including construction sites of less than one acre that are part of a common plan of development or sale that is greater than one acre, shall obtain coverage under the construction stormwater general permit issued by the State of Washington Department of Ecology.
Full Breakdown
WWCC 11.07.030 sets the county's construction and post-construction stormwater standards, and subsection C, 'Construction Site Runoff Control,' is where erosion and sediment control during building activity is addressed. Any construction site disturbing one acre or more, and any smaller site that is part of a common plan of development or sale exceeding one acre, must prepare a stormwater site plan and a stormwater pollution prevention plan (SWPPP) following Chapters 3 and 7 of the Stormwater Management Manual for Eastern Washington before work begins. Construction operators must provide erosion and sediment control BMPs and implement source control BMPs during construction to protect water quality, reduce pollutant discharge, and satisfy the state's AKART standard, all known, available and reasonable methods of prevention, control and treatment, with those BMPs selected, designed, installed, operated and maintained to the manual's standards.
Under WWCC 11.07.030(C)(1)(b), a project disturbing between one and five acres between June 15 and October 15 may instead apply for a state erosivity waiver, which excuses it from the SWPPP requirement for that certified period; work that runs past the waiver window needs either a revised waiver or a full stormwater site plan for the remaining work. Every qualifying site must also obtain coverage under the state Department of Ecology's construction stormwater general permit. Plans and SWPPPs are filed with and reviewed by the county engineer under WWCC 11.07.040, and the developer bears responsibility for construction inspection, staking and record drawings under WWCC 11.07.050.
Failure to control erosion is enforced through the civil and criminal process WWCC 11.01.070 applies to the rest of Title 11, since Chapter 11.07 violations fall under that section's enforcement scheme.
Violations & Fines
Failing to prepare the required stormwater site plan and SWPPP, or failing to install and maintain erosion and sediment control BMPs, is enforced under WWCC 11.01.070: the county engineer may issue a notice of violation and order, require a voluntary correction agreement, and impose civil penalties, with criminal penalties available under WWCC Chapter 14.13 for continued noncompliance.
Frequently Asked Questions
When does my construction project need an erosion control plan in Walla Walla County?
Can I skip the SWPPP for a small project?
Who reviews my erosion control plan?
Sources & Official References
Other rules in Walla Walla County
Compare Walla Walla County to another location·View the Washington environmental rules overview
See something wrong?