Key Facts

Reclamation guarantee amount
$1,500 per acre disturbed, $1,500 minimum
Deficiency response window
10 calendar days before collection starts
Pre-construction requirement
Silt fence, construction entrance, limit fencing
Guarantee release test
Little erosion/sedimentation risk remaining onsite
Enforcing agency
Pierce County Planning and Public Works
Final approval trigger
Requires permanent soil stabilization (17A.10.090)

Summary

Every site development permit in unincorporated Pierce County carries a Reclamation Guarantee under PCC 17A.20.020 that keeps erosion control measures running through construction and locks in permanent stabilization once work wraps up. The guarantee runs $1,500 per acre disturbed, $1,500 minimum, and pays for County cleanup if a builder walks away mid-project. Silt fencing and a stabilized construction entrance must go in before grading starts.

City-specific rules exist: Lakewood, and Tacoma have their own erosion control rules that differ from Pierce County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

A. The purpose of this guarantee is to ensure that adequate erosion control measures are employed during the course of construction and that permanent stabilization is achieved at the conclusion of significant activity. The guarantee may be utilized to reduce drainage impacts and permanently stabilize the site in the event that the County determines a site has been abandoned after construction begins. Pierce County will consider a site to be abandoned based on a lack of response by the principal to correct noted deficiencies or non-completion of improvements prior to permit expiration. Permanent stabilization includes reclamation of the site if a project is abandoned after construction begins. B. The guarantee shall be for $1,500 per acre to be disturbed, $1,500 minimum.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-515, and legislation passed through May 26, 2026).

Full Breakdown

020 requires every project holding a Pierce County site development permit to post a Reclamation Guarantee before the permit is approved, specifically to ensure that adequate erosion control measures are employed during the course of construction and that permanent stabilization is achieved once significant activity ends. The guarantee is set at $1,500 per acre to be disturbed, with a $1,500 minimum, and it exists so the County can step in and stabilize a site itself if a builder abandons the project, which the code defines as a failure to respond to noted deficiencies or to finish improvements before the permit expires.

The County Inspector recommends release of the guarantee only when little potential for erosion, sedimentation, or stormwater impacts remains on the site, and that release comes after the conclusion of significant construction activity. If the County identifies a deficiency in erosion control, site stabilization, or signs of abandonment, it sends the principal written notice, and the principal has 10 calendar days to respond before the County starts collection proceedings on the guarantee. B bars construction from starting until initial Construction Stormwater Pollution Prevention Plan measures, including a stabilized construction entrance, silt fence, and construction limit fencing, are installed.

a must still work through the Stormwater Management and Site Development Manual's 13 elements of pollution prevention for the site. 090 will not issue until the site soils have reached permanent stabilization.

Violations & Fines

Miss the erosion control deficiency deadline and the County moves straight to collection proceedings on the Reclamation Guarantee, no second notice required: PCC 17A.20.020.D gives a principal 10 calendar days to respond once the County flags a problem. Start grading before the silt fence, construction entrance, and limit fencing required by PCC 17A.10.080.B are installed and the site development permit itself is not properly in force.

Frequently Asked Questions

How much is Pierce County's erosion control guarantee for a construction site?
PCC 17A.20.020 sets the Reclamation Guarantee at $1,500 per acre to be disturbed, with a $1,500 minimum on every project. The County accepts it before approving the site development permit and holds it to fund erosion control and site stabilization if the project is abandoned mid-construction.
What erosion control measures does Pierce County require before construction starts?
PCC 17A.10.080.B bars construction from beginning until initial Construction Stormwater Pollution Prevention Plan measures are installed, including a stabilized construction entrance, silt fence, and construction limit fencing. Smaller exempt projects still must address the Stormwater Manual's 13 pollution prevention elements before work begins.
What happens if Pierce County flags an erosion control deficiency on my site?
The County sends written notice identifying the deficiency, and PCC 17A.20.020.D gives the principal 10 calendar days to respond with a fix or a plan to fix it. If nothing satisfactory comes back in that window, the County begins collection proceedings against the Reclamation Guarantee.
When does Pierce County release the erosion control guarantee?
The County Inspector recommends release only after significant construction activity has concluded and the inspector determines little potential for erosion, sedimentation, or stormwater impacts remains on the site, per PCC 17A.20.020.C. That determination is separate from the Defect and Maintenance Guarantee, which covers drainage facilities over a longer 24-month period.

Sources & Official References

Other rules in Pierce County

All Pierce County rules

Compare Pierce County to another location·View the Washington environmental rules overview

Get notified when Erosion Control in Pierce County, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Pierce County