Lakewood, WA Environmental Rules: Erosion Control (2026)
Key Facts
- Trigger
- Any clearing, grading or site disturbance
- SWPPP required for
- Projects meeting Table 12.11-1 thresholds
- State permit trigger
- Over 1 acre with discharge potential
- State permit issuer
- Washington Dept. of Ecology
- Governing sections
- LMC 12.10.040, 12.11.040(B), 12.11.050
Summary
Every Lakewood project that clears, grades or otherwise disturbs a site must use erosion and sediment control best management practices to keep sediment from reaching downstream drainage, water resources and neighboring properties, under LMC 12.10.040. Larger projects must also prepare a construction stormwater pollution prevention plan and, above one acre with discharge potential, a state DOE permit.
12.10.040 Erosion control. ... All proposed projects that will clear, grade, or otherwise disturb a site shall provide erosion and sediment control best management practices (BMPs) to prevent, to the maximum extent possible, the transport of sediment from the project site to downstream drainage facilities, water resources, and adjacent properties. ... 12.11.040 Minimum surface water and storm water requirements. ... ... B. Minimum Requirement No. ... 2 – Construction Storm Water Pollution Prevention. All new development and redevelopment projects are responsible for preventing erosion and discharge of sediment and other pollutants leaving the site. Projects meeting the thresholds described in LMC 12.11.030, Table 12.11-1, shall prepare a construction storm water pollution prevention plan (SWPPP) as part of the storm water site plan. ... In addition, projects greater than one acre that have the potential to discharge to waters of the state, as determined by the City Engineer, shall apply for a construction storm water general permit through the DOE.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 852, passed June 15, 2026).
Full Breakdown
LMC 12.10.040 requires temporary and permanent erosion and sediment control BMPs on any project that clears, grades or otherwise disturbs a site, designed to prevent, to the maximum extent possible, sediment transport from the project site to downstream drainage facilities, water resources and adjacent properties. LMC 12.11.040(B), Minimum Requirement No. 2 of the City's stormwater code, builds on that duty: every new development and redevelopment project is responsible for preventing erosion and the discharge of sediment or other pollutants leaving the site, and any project meeting the drainage-review thresholds in Table 12.11-1 at LMC 12.11.030 must prepare a construction stormwater pollution prevention plan (SWPPP) as part of its stormwater site plan.
Projects larger than one acre that could discharge to waters of the state, as the City Engineer determines, must also obtain a construction stormwater general permit from the Washington Department of Ecology, with SWPPP guidance available through DOE. LMC 12.11.050 ties the timing to construction sequencing: erosion and sediment control measures for both interim and permanent drainage systems must be built according to the approved plan before any grading or clearing beyond what the erosion control plan itself allows, and they must be maintained until all improvements, restoration and landscaping are complete and the risk of on-site erosion has passed. Recording of short plats and subdivisions cannot occur before drainage facilities, roadways and sidewalks are built and accepted.
Violations & Fines
LMC 12.11.020(D) bars any land-clearing, grading or other construction activity covered by Title 12 from starting or continuing without a valid permit from the Department, and a project's SWPPP must be implemented from initial soil disturbance until final stabilization under LMC 12.11.040(B). A site left without the required BMPs, or an unauthorized DOE stormwater general permit for a project over one acre, risks stop-work action and denial of final plat, occupancy or site-development sign-off until compliance is demonstrated.
Frequently Asked Questions
When does a Lakewood construction project need a stormwater pollution prevention plan?
Do I need a state permit for erosion control on a Lakewood project?
When must erosion control be in place on a Lakewood site?
Sources & Official References
Other rules in Lakewood
Compare Lakewood to another location·View the Washington environmental rules overview