Weber County, UT Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Permit trigger
>5,000 sq ft disturbed or 200 cu yd cut/fill
Reviewing office
County engineering dept / storm sewer utility manager
Stabilization deadline
14 days after grading stops
Penalty
Class C misdemeanor, each day separate
Large-site threshold
5+ acres needs state DWQ permit instead
Inspections
County, state, and EPA may enter anytime

Summary

Weber County requires a stormwater construction activity permit before any excavation, grading, or land-disturbing construction in the unincorporated county that disturbs more than 5,000 square feet or moves more than 200 cubic yards of material. The county engineering department reviews the required stormwater pollution prevention plan, and moving dirt before approval is unlawful under Code § 40-3-2.

These county ordinances apply to unincorporated areas of Weber County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

A county stormwater construction activity permit is required before any person or entity may excavate, grub and clear, grade, or perform any type of construction activity that will disrupt or cause a change in the natural landscape upon any of the following types of property located within the unincorporated county: ... Disturbs more than 5,000 square feet of land surface area; Consists of the excavation and/or fill of more than 200 cubic yards of material; or Requires a building permit for which excavation or fill is a part of the construction, and less than five acres; shall apply for a county permit. Activities involving five acres or more must get a permit from the state division of water quality.

Full Breakdown

Any excavation, grubbing, grading, or other construction activity that disrupts the natural landscape on unincorporated county land triggers Weber County's stormwater construction activity permit under Code § 40-3-2. The permit is mandatory once a project disturbs more than 5,000 square feet of land surface, moves more than 200 cubic yards of cut or fill, or requires a building permit involving excavation on a parcel under five acres. Projects of five acres or larger fall instead under a state Division of Water Quality permit. Applicants file with the county engineering department, submitting a stormwater pollution prevention plan meeting the content standards of § 40-3-4 before or with their subdivision plat, site plan, building permit, or land use permit application (§ 40-3-3).

The storm sewer utility manager reviews and approves, conditions, or denies the plan. Under § 40-3-4, the plan must describe site conditions, list best management practices such as silt fence, sediment traps, gravel construction entrances, and inlet protection, and commit to stabilizing any disturbed area within 14 days after grading work stops there, longer only if snow or frozen ground prevents seeding or if work resumes within 21 days. Section 40-3-5 requires the permittee to install those measures before construction begins and maintain them until the county accepts a notice of termination.

County engineering staff, the state water quality division, and EPA representatives may inspect the site at any time under § 40-3-6. A permit can be revoked or suspended on ten to 30 days' notice for noncompliance (§ 40-3-7), triggering a stop-work order until the plan is corrected and reissued.

Violations & Fines

Moving dirt on a site before the required permit issues is unlawful under § 40-3-2. Violating any provision of Chapter 40-3 is a Class C misdemeanor, with each day of violation a separate offense under § 40-3-8. The county may also issue a stop-work order, install or maintain erosion controls itself and bill the property owner or contractor, or draw against the posted financial guarantee. State Water Quality Act and EPA penalties can apply on top of the county citation.

Frequently Asked Questions

When does Weber County require a stormwater construction permit?
A county stormwater construction activity permit is required once unincorporated-area construction disturbs more than 5,000 square feet or involves excavation or fill of more than 200 cubic yards, or whenever a building permit application includes excavation on a parcel under five acres, per Weber County Code § 40-3-2.
Who approves the stormwater pollution prevention plan?
The county engineering department accepts applications, and the storm sewer utility manager or designee approves, conditions, or denies the plan under § 40-3-4 based on whether the proposed erosion and sediment controls meet the chapter's stabilization and best-management-practice standards.
What happens if I start grading before getting the permit?
It is unlawful to move dirt before the permit issues. A violation is a Class C misdemeanor with each day counted separately under § 40-3-8, and the county can issue a stop-work order or install erosion controls itself and bill the owner or contractor.
How soon must disturbed ground be stabilized?
Section 40-3-4 requires stabilization measures like seeding, mulching, or erosion blankets to begin within 14 days after construction activity stops on that portion of the site, extended only for snow, frozen ground, or if work will resume within 21 days.

Sources & Official References

Other rules in Weber County

All Weber County rules

Compare Weber County to another location·View the Utah environmental rules overview

Get notified when Erosion Control in Weber County, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.