Environmental Rules in Utah (2026)

81 rules on the books across Utah, 16 cities and counties. Select a rule to read the full details.

Severity: Few Restrictions · Light Restrictions · Some Restrictions · Significant Restrictions · Heavy Restrictions

Stormwater Management

Requirements for managing rainwater runoff on your property, including retention basins, permeable surfaces, and drainage plans.

Lehi

Significant Restrictions

Lehi regulates stormwater system design, construction, illicit discharges and inspections citywide under a dedicated…

Read full rule →

Weber County

Significant Restrictions

Weber County bans any illicit discharge into its storm sewer system in the unincorporated county, with narrow…

Read full rule →

West Valley City

Significant Restrictions

West Valley City requires a Storm Water Management Permit for any construction disturbing an acre or more and for all…

Read full rule →

Davis County

Some Restrictions

Unincorporated Davis County requires a development permit before recording any subdivision plat, and a construction…

Read full rule →

Eagle Mountain

Some Restrictions

Eagle Mountain charges a storm water utility fee on every developed parcel with impervious surface that contributes…

Read full rule →

Layton

Some Restrictions

Layton bans dumping pollutants into its storm drain system under City Code Chapter 13.16, the Illicit Discharge and…

Read full rule →

Orem

Some Restrictions

Orem makes it unlawful to obstruct, cover, or contribute to blocking any part of the City's storm water system…

Read full rule →

Provo

Some Restrictions

Provo bans dumping anything but clean storm water into the storm drainage system or Utah Lake tributaries under City…

Read full rule →

Salt Lake City

Some Restrictions

Salt Lake City bans dumping anything but stormwater into its storm drains, backed by fines up to $10,000 per violation…

Read full rule →

Salt Lake County

Some Restrictions

Development sites in unincorporated Salt Lake County must meet the post-construction stormwater performance criteria in…

Read full rule →

Sandy

Some Restrictions

Sandy City Code Chapter 9-1, the Storm Water Quality and Enforcement ordinance, bars discharging pollutants into the…

Read full rule →

South Jordan

Some Restrictions

South Jordan won't issue a building permit, subdivision approval, or other development permit unless the project…

Read full rule →

St. George

Some Restrictions

St. George requires a grading permit before disturbing one acre or more of land, backed by a state notice of intent and…

Read full rule →

Utah County

Some Restrictions

Utah County requires a land disturbance permit from the County Engineer before grading, clearing, or filling one acre…

Read full rule →

Washington County

Some Restrictions

Washington County requires every subdivision to install a stormwater drainage system that is separate from the sanitary…

Read full rule →

West Jordan

Some Restrictions

West Jordan bans dumping anything but stormwater into its municipal storm drain system and applies the rule to every…

Read full rule →

Erosion Control

Rules to prevent soil erosion during construction and landscaping, including required sediment barriers and ground cover standards.

Utah: statewide

StatewideSome Restrictions

Land-disturbing construction of one acre or more in Utah must obtain a UPDES Construction General Permit from the…

Read full rule →

Davis County

Significant Restrictions

Anyone disturbing one acre or more of ground in unincorporated Davis County must obtain a General Construction County…

Read full rule →

Salt Lake County

Significant Restrictions

Grading, borrow pits and land disturbance over an acre in unincorporated Salt Lake County require a land disturbance…

Read full rule →

Sandy

Significant Restrictions

Sandy declares blowing dust, soil and sand a public nuisance under §21-27-9 and makes every property owner responsible…

Read full rule →

Utah County

Significant Restrictions

Unincorporated Utah County requires a land disturbance permit from the County Engineer before grading, clearing or…

Read full rule →

Eagle Mountain

Some Restrictions

Eagle Mountain requires a sealed sediment and erosion control plan for every construction activity that disturbs land…

Read full rule →

Layton

Some Restrictions

Layton requires cut and fill slopes to be prepared and maintained against erosion, using effective planting or devices…

Read full rule →

Lehi

Some Restrictions

Lehi requires a grading permit before disturbing more than one acre of land or moving more than two feet of fill or…

Read full rule →

Orem

Some Restrictions

Orem requires a Land Disturbance Permit before any activity disturbing 500 or more square feet of land, backed by a…

Read full rule →

Provo

Some Restrictions

Provo requires every slope disturbed by hillside construction to be revegetated to match or beat the erosion-control…

Read full rule →

Salt Lake City

Some Restrictions

Construction permit holders in Salt Lake City must install erosion and stormwater runoff controls to keep sediment and…

Read full rule →

South Jordan

Some Restrictions

South Jordan requires a land disturbance permit before any grading, and the application must include a…

Read full rule →

St. George

Some Restrictions

St. George requires a sediment and erosion control plan for any construction project disturbing one acre or more, or…

Read full rule →

Washington County

Some Restrictions

Any grading or construction on slopes over 20% in unincorporated Washington County needs a hillside development permit…

Read full rule →

Weber County

Some Restrictions

Weber County requires a stormwater construction activity permit before any excavation, grading, or land-disturbing…

Read full rule →

West Jordan

Some Restrictions

West Jordan requires a land disturbance permit before any grading, clearing, or earthwork, and section 11-3-18 makes…

Read full rule →

West Valley City

Some Restrictions

West Valley City bars approval of any site construction plan without an approved Storm Water Pollution Prevention Plan…

Read full rule →

Flood Zones

Building requirements for properties in FEMA flood zones, including elevation standards, flood insurance mandates, and construction limits.

Davis County

Significant Restrictions

Building, filling or developing anywhere in a Davis County FEMA special flood hazard area requires a development permit…

Read full rule →

Layton

Significant Restrictions

Layton requires a development or building permit before any construction begins in a mapped special flood hazard area…

Read full rule →

Lehi

Significant Restrictions

Lehi requires a Floodplain Development Permit for any construction, fill, or alteration within a FEMA-mapped special…

Read full rule →

Salt Lake County

Significant Restrictions

Any new construction, substantial improvement, fill or manufactured-home placement inside a FEMA-mapped special flood…

Read full rule →

Sandy

Significant Restrictions

Sandy City regulates development in FEMA-mapped flood hazard areas through its Floodplain Overlay Zone under City Code…

Read full rule →

Utah County

Significant Restrictions

Unincorporated Utah County requires a Floodplain Administrator clearance before any construction, grading or land…

Read full rule →

Eagle Mountain

Some Restrictions

Eagle Mountain regulates construction in flood-prone land under Chapter 15.105 EMMC, Flood Damage Prevention, which…

Read full rule →

Orem

Some Restrictions

Orem requires a development permit before any construction or land-disturbing work begins in a mapped area of special…

Read full rule →

Provo

Some Restrictions

Provo requires a floodplain development permit before any construction begins in a special flood hazard area, with the…

Read full rule →

Salt Lake City

Some Restrictions

Building or development in a Salt Lake City floodplain hazard area requires a permit and elevation or floodproofing…

Read full rule →

South Jordan

Some Restrictions

South Jordan participates in the National Flood Insurance Program (NFIP) and enforces floodplain development standards…

Read full rule →

St. George

Some Restrictions

St. George requires an engineer-prepared flood hazard development permit for any construction in a FEMA special flood…

Read full rule →

Washington County

Some Restrictions

Washington County requires a development permit before any construction or fill begins in an area of special flood…

Read full rule →

Weber County

Some Restrictions

Weber County regulates every area FEMA maps as a special flood hazard on its November 30, 2023 Flood Insurance Rate…

Read full rule →

West Jordan

Some Restrictions

West Jordan layers a Floodplain Overlay Zone (F-P) onto any base zoning district that FEMA's flood insurance rate maps…

Read full rule →

West Valley City

Some Restrictions

West Valley City requires a Development Permit before any construction, filling, grading, or land-use change within a…

Read full rule →

Defensible Space

Mandated vegetation clearance zones around homes in fire hazard zones, including the 100-ft Zone 0/1/2 model used by California and other wildfire-prone states.

Flood Elevation Requirements

FEMA NFIP minimum base flood elevation (BFE) construction standards for properties in mapped flood zones, including freeboard requirements above BFE.

Layton

Significant Restrictions

Layton requires substantially improved residential structures in the special flood hazard area to elevate the lowest…

Read full rule →

Lehi

Significant Restrictions

New and substantially improved homes in Lehi's mapped flood zones must have their lowest floor, including any basement…

Read full rule →

Utah County

Significant Restrictions

In Utah County's mapped flood hazard areas, new homes and commercial buildings must have their lowest floor, including…

Read full rule →

Davis County

Some Restrictions

In Davis County's unincorporated special flood hazard areas, new residential construction and substantial improvements…

Read full rule →

Eagle Mountain

Some Restrictions

Eagle Mountain's floodplain administrator, the city building official, requires a building permit applicant to document…

Read full rule →

Orem

Some Restrictions

In Orem's mapped special flood hazard areas, new homes and substantially improved structures must have the lowest floor…

Read full rule →

Provo

Some Restrictions

In Provo's Special Flood Hazard Area, the lowest floor of every new structure, including basements, must sit at least…

Read full rule →

Salt Lake City

Some Restrictions

New homes and additions in Salt Lake City's mapped floodplain hazard area must have the lowest floor built at or above…

Read full rule →

Salt Lake County

Some Restrictions

Salt Lake County requires new and substantially improved homes in mapped special flood hazard areas to elevate the…

Read full rule →

Sandy

Some Restrictions

Sandy City requires every new or substantially improved residential structure in a mapped flood hazard area to elevate…

Read full rule →

South Jordan

Some Restrictions

New and substantially improved residential structures in South Jordan's mapped flood hazard areas must have their…

Read full rule →

St. George

Some Restrictions

St. George requires new residential construction in flood hazard areas to elevate the lowest floor at least two feet…

Read full rule →

Washington County

Some Restrictions

Washington County requires new and substantially improved residential structures in a mapped flood hazard area to…

Read full rule →

Weber County

Some Restrictions

New homes and substantially improved residential structures in Weber County's mapped flood hazard areas must have their…

Read full rule →

West Jordan

Some Restrictions

West Jordan requires new construction and substantial improvements in a special flood hazard area to have the lowest…

Read full rule →

West Valley City

Some Restrictions

In West Valley City's mapped flood hazard areas, new and substantially improved homes must have their lowest floor…

Read full rule →