Key Facts
- Residential lowest floor
- Two feet (2') above base flood elevation, basement included
- Nonresidential option
- Elevate two feet or floodproof to two feet above base flood level
- Shallow flooding (AO/AH)
- Two feet above FIRM depth number or highest adjacent grade
- Critical facilities
- Two feet above BFE or 500-year flood height, whichever is higher
- Enclosure vent openings
- At least two, bottoms no higher than one foot above grade
- Penalty
- Misdemeanor under chapter 1.16 penalty provisions
Summary
In Logan City, Utah, new homes and substantial improvements in a special flood hazard area must have the lowest floor, basement included, elevated two feet above the base flood elevation. Nonresidential buildings meet the same two-foot mark or are floodproofed to it, and an engineer, architect or surveyor must certify the result to the floodplain administrator.
In all areas of special flood hazards where base flood elevation data has been provided as set forth in LMC § 15.27.060, § 15.27.130, or § 15.27.180 of this chapter, the following provisions are required: A. Residential Construction: New construction and substantial improvement of any residential structure shall have the lowest floor (including basement), elevated two feet (2') above the base flood elevation. A registered professional engineer, architect, or land surveyor shall submit a certification to the floodplain administrator that the standard of this subsection as proposed in LMC § 15.27.140.A.1 of this chapter, is satisfied. B. Nonresidential Construction - new construction and substantial improvements of any commercial, industrial or other nonresidential structure shall: 1. Have the lowest floor (including basement) elevated two feet (2') above the base flood level; or
Full Breakdown
Chapter 15.27 of the Logan Municipal Code sets the elevation rules, and section 15.27.170 is the core standard wherever base flood elevation data has been provided. For residential construction, the lowest floor including any basement must sit two feet (2') above the base flood elevation. A registered professional engineer, architect, or land surveyor submits a certification to the floodplain administrator that the standard is satisfied. Nonresidential buildings have two paths: elevate the lowest floor two feet above the base flood level, or design the structure and its utility and sanitary facilities to be watertight with walls substantially impermeable to water for at least two feet above that level. The floodproofing route requires a registered engineer or architect to certify the design, and the Floodplain Administrator keeps a record of the elevation to which the structure is floodproofed.
Manufactured homes in the flood zones follow the same two-foot rule and must be anchored to resist flotation, collapse, and lateral movement. Fully enclosed areas below the lowest floor that are used only for parking, building access or storage need at least two openings with a total net area of not less than one square inch for every square foot of enclosed area, and the bottom of every opening can be no higher than one foot (1') above grade.
Where flooding is shallow, in AO and AH zones with base flood depths of one to three feet, section 15.27.190 requires the lowest floor to be elevated two feet above the depth number on the FIRM, or at least two feet above the highest adjacent grade if no depth number is specified. Section 15.27.210 sets critical facilities two feet above the base flood elevation or at the height of the 500-year flood, whichever is higher. Subdivision and site plans under 15.27.180 must identify the base flood elevation, and lots and parcels of one acre or smaller are excused from determining it unless they are in a subdivision, multi-family, commercial or industrial development, or manufactured home park.
Violations & Fines
Section 15.27.220 makes noncompliance with chapter 15.27 a misdemeanor, and the penalty provisions of title 1, chapter 1.16 of the Logan Municipal Code apply. Under 15.27.230 the city has sole discretion to file a civil or criminal case or pursue administrative enforcement, and administrative cases follow the procedures in Logan Land Development Code chapter 17.60.
Frequently Asked Questions
How high must a new house in a Logan flood zone be built?
Can a commercial building in Logan be floodproofed instead of raised?
What changes in AO and AH shallow flooding zones?
Do small lots have to establish the base flood elevation?
Sources & Official References
Other rules in Logan
Compare Logan to another location·View the Utah environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.