Taylorsville, UT Environmental Rules: Erosion Control (2026)
Key Facts
- Permit trigger
- 1+ acre of land disturbance, or smaller common plan
- Plan requirement
- Sealed by Utah-licensed professional engineer
- Track-out cleanup
- Removed by end of workday
- Enforcement
- City Engineer administers Chapter 17.05
- Penalty class
- Infraction under Utah Code Ann. § 19-5-115
Summary
Taylorsville requires a sediment and erosion control plan sealed by a Utah-licensed engineer under Section 17.05.190 for construction activity meeting the State of Utah's general construction permit, with a land disturbance permit from the City Engineer triggered at one acre or more of disturbed land.
17.05.190: SEDIMENT AND EROSION CONTROL PLANS: ... The applicant must prepare a sediment and erosion control plan which meets the requirement of the State of Utah general construction permit for all construction activities that includes the following information: A. The sediment and erosion control plan shall accurately describe the potential for soil erosion and sedimentation problems resulting from land disturbing activity and shall explain and illustrate the measures that are to be taken to control these problems. ... The plan shall be sealed by a registered professional engineer licensed in the State of Utah. ... ... 15. Specific details for: the construction of rock pads, wash down pads, and settling basins for controlling erosion; road access points; eliminating or keeping soil, sediment, and debris on streets and public ways at a level acceptable to the City Engineer. Soil, sediment, and debris brought onto streets and public ways must be removed, at minimum, by the end of the workday by machine, broom or shovel. ... Failure to remove the sediment, soil or debris shall be deemed a violation of this chapter;
Full Breakdown
Chapter 17.05 of the Taylorsville City Code, adopted to meet the City's NPDES/UPDES stormwater permit obligations under 40 CFR 122.26, requires a land disturbance permit from the City Engineer under Section 17.05.040 for any land-disturbing activity of one acre or more, for smaller activity that is part of a larger common plan reaching one acre, for borrow pits, single-family home construction, earthen-materials processing, or parking lot construction, or for any smaller activity the City Engineer determines poses a unique risk to water or air quality.
Section 17.05.190 then requires the applicant's sediment and erosion control plan to be sealed by a Utah-licensed professional engineer and to conform to the City's BMP manual, with at least seventeen listed elements including a project description, topographic mapping of existing and proposed contours, existing drainage ways and floodplains, tree preservation and removal details, clearing and grading limits, existing and post-construction stormwater flows, sedimentation-control layout, drainage network and waterway sizing, a construction sequence tied to grading and drainage work, and specifics for rock pads, wash-down pads and settling basins.
Soil, sediment and debris tracked onto streets and public ways must be removed by the end of the workday by machine, broom or shovel, more often if the City Engineer finds hazards or tracking nuisances, and street cleaning must minimize dust and airborne emissions. The Code states plainly that failing to remove that sediment, soil or debris is a violation of the chapter, and Section 17.05.250 makes any violation of the City's stormwater ordinances an infraction consistent with Utah Code Ann. Section 19-5-115.
Violations & Fines
Section 17.05.190 itself declares that failing to remove sediment, soil or debris tracked onto streets and public ways by the end of the workday is a violation of the chapter, and Section 17.05.250 makes any violation of Taylorsville's stormwater ordinances an infraction consistent with Utah Code Ann. Section 19-5-115, with the City able to recover abatement costs and other damages on top of any penalty.
Frequently Asked Questions
When does Taylorsville require a land disturbance permit for erosion control?
Who has to seal a Taylorsville erosion control plan?
What happens if construction tracks mud onto a Taylorsville street?
Is violating Taylorsville's erosion control chapter a criminal offense?
Sources & Official References
Other rules in Taylorsville
Compare Taylorsville to another location·View the Utah environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Salt Lake County handle erosion control.