Key Facts

Residential freeboard
Base flood elevation plus 1 foot
Nonresidential option
Same freeboard or certified watertight design
Certification required
Registered engineer, architect, or land surveyor
Large subdivisions
Own BFE data above 50 lots or 5 acres
Maximum penalty
$1,000 fine or 6 months jail per violation

Summary

New or substantially improved homes in a Taylorsville flood hazard area must have their lowest floor, including any basement, built at least one foot above the base flood elevation, and nonresidential buildings must meet that same one-foot freeboard or be engineered watertight below it.

1. Residential Construction: ... New construction and substantial improvement of any residential structure shall have the lowest floor (including basement) elevated to or above the base flood elevation plus one foot (1'). ... ... 2. Nonresidential Construction: New construction and substantial improvements of any commercial, industrial, or other nonresidential structure shall either have the lowest floor (including basement) elevated to or above the base flood levelelevation plus one foot (1') or together with attendant utility and sanitary facilities, be designed so that below the base flood level the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy.

Full Breakdown

Section 17.02.070 sets Taylorsville's freeboard standard for flood hazard reduction. For residential construction, subsection B1 requires the lowest floor, including any basement, of new construction and substantial improvements to sit at or above the base flood elevation plus one foot, certified by a registered professional engineer, architect, or land surveyor to the floodplain administrator. Subsection B2 gives nonresidential buildings, meaning commercial, industrial, or other nonresidential structures, a choice: meet that same one-foot freeboard over base flood elevation, or instead design the structure watertight below the base flood level, with walls substantially impermeable to water and components engineered to resist hydrostatic and hydrodynamic loads, certified by a registered engineer or architect and recorded with the floodplain administrator along with the specific elevation to which the building is floodproofed.

The freeboard requirement applies on top of the general construction standards in subsection A, which require anchoring against flotation and lateral movement and flood-resistant materials, and it interacts with the manufactured home and recreational vehicle elevation rules in subsections B4 and B5, which use the unmodified base flood elevation rather than the extra foot of freeboard as their baseline. Subdivisions of more than fifty lots or five acres, whichever is smaller, must generate their own base flood elevation data under subsection C3 if the FIRM does not already supply it.

Violations & Fines

Failing to elevate a new or substantially improved structure to the base flood elevation plus one foot, or to meet the certified floodproofing alternative for nonresidential buildings, is enforced as a Chapter 17.02 violation under section 17.02.080: a misdemeanor punishable by a fine of not more than $1,000 or imprisonment of not more than six months, or both, for each violation, plus the costs and expenses of the case. The floodplain administrator can also refuse to certify the required elevation or floodproofing record until the standard is met.

Frequently Asked Questions

How much higher than the base flood elevation must a new Taylorsville home be built?
Section 17.02.070 subsection B1 requires the lowest floor, including any basement, of new construction or a substantial improvement to sit at or above the base flood elevation plus one foot, certified to the floodplain administrator by a registered engineer, architect, or land surveyor.
Can a commercial building in Taylorsville skip the one-foot freeboard requirement?
Only by using the alternative in subsection B2: instead of elevating the lowest floor a foot above base flood elevation, the building can be engineered watertight below that level, with impermeable walls and structural components rated to resist flood loads, certified by a registered engineer or architect.
Who certifies that a Taylorsville structure meets the base flood elevation freeboard rule?
A registered professional engineer, architect, or land surveyor must submit the certification to the floodplain administrator, the City Engineer or a designee under section 17.02.060, confirming the lowest floor was built to or above the base flood elevation plus one foot.

Sources & Official References

Other rules in Taylorsville

All Taylorsville rules

Compare Taylorsville to another location·View the Utah environmental rules overview

Get notified when Flood Elevation Requirements in Taylorsville, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Salt Lake County handle flood elevation requirements.

West Valley City, UT
Some Restrictions
Salt Lake City, UT
Some Restrictions
South Jordan, UT
Some Restrictions
Sandy, UT
Some Restrictions
West Jordan, UT
Some Restrictions