West Jordan, UT Environmental Rules: Erosion Control (2026)
Key Facts
- Permit required
- Before any land disturbance, § 11-2-1
- BMPs shown on
- Project drawings, § 11-3-18
- Subdivision-level inspection
- City Engineering Department
- Lot-level inspection
- Building Division
- Penalty
- Class B misdemeanor, § 11-6-3
- Enforcement tools
- Notice of violation, permit suspension, stop work order
Summary
West Jordan requires a land disturbance permit before any grading, clearing, or earthwork, and section 11-3-18 makes the developer detail the erosion-control and revegetation best management practices to be used on the project drawings. The City Engineering Department inspects those measures at the subdivision level, and the Building Division inspects them again once work moves to individual lots.
The developer is to indicate erosion control and revegetation BMPs to be used for the project on the project drawings and as part of the project descriptions included with the application in accordance with the city LDDCS. Erosion and sedimentation control measures will be inspected upon completion, during construction of the subdivision, and once the subdivision construction is complete. The engineering department will be responsible for these inspections. Once the subdivision level construction is complete and improvement work begins on individual lots, erosion and sedimentation control BMPs will be inspected prior to any disturbance, during construction and once lot level construction is complete. The building division will be responsible for these inspections.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-38: Code current through: Ord. 26-33, passed 6-23-2026).
Full Breakdown
Before any land disturbance, grading, clearing and grubbing, or earthmoving begins, section 11-2-1 requires the developer, builder, or contractor to obtain a land disturbance permit from the city; for projects needing site plan or subdivision approval, that permit generally cannot issue until the final site plan or final subdivision plat is approved, with a narrow exception for large, high-value economic development projects under subsection B. Section 11-3-18 then sets the erosion-control content of that permit application: the developer must show, on the project drawings and in the project description, which erosion-control and revegetation best management practices (BMPs) will be used, in accordance with the city's Land Disturbance Design and Construction Standards (LDDCS).
BMPs are defined broadly in section 11-1-5 to include seeding, mulching, vegetative buffer strips, sod, plastic coverings, riprap, gabions, other channel-armoring methods, burlap coverings, and watering. Inspection responsibility shifts as a project moves forward: the City Engineering Department inspects erosion and sedimentation control measures at the subdivision level, both during construction and once subdivision construction is complete, while the Building Division takes over lot-level inspections once individual-lot improvement work begins, checking BMPs before any disturbance, during construction, and once lot-level construction is complete. Section 11-3-19 lets the City Engineer require a wet weather plan and modify erosion-control or revegetation plans if weather causes unforeseen delays.
Enforcement runs through chapter 6: the City Engineer and other enforcement authorities can issue a notice of violation or citation, suspend or revoke the land disturbance permit, require a bond or other security, or issue a stop work order, and each day a violation continues is a separate offense.
Violations & Fines
Failing to install or maintain the erosion-control and revegetation BMPs shown on the approved land disturbance permit is a violation under section 11-6-2, and each day a violation continues is a separate offense. Section 11-6-3 makes any violation of title 11 a Class B misdemeanor on conviction, and the city can also suspend or revoke the land disturbance permit or issue a stop work order under sections 11-6-5 and 11-6-11.
Frequently Asked Questions
Does West Jordan require an erosion control plan before grading a site?
Who inspects erosion control measures on a West Jordan project?
What happens if erosion control BMPs aren't maintained?
Can weather delays change an approved erosion control plan?
Sources & Official References
Other rules in West Jordan
Compare West Jordan to another location·View the Utah environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Salt Lake County handle erosion control.