Skip to main content
CityRuleLookup

West Jordan, UT Parking Rules: EV Charging (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Applicable zone
Interchange Overlay Zone (IOZ), Mountain View Corridor / Bangerter Highway
Charging mandate
One 220-volt EV charging station per parking structure
Parking incentive
EV charging space counts toward required parking total
Governing section
City Code § 13-6K-5-1(E)(6)
Enforcing office
Community Development Director or designee, § 13-6K-6(A)
Adopted
Ordinance 24-36, August 27, 2024
Penalty
Class C misdemeanor, each day a separate offense

Summary

West Jordan requires a 220-volt electric vehicle charging station in every parking structure built for mixed-use, multi-family, or townhome development inside the Interchange Overlay Zone (IOZ) near the Mountain View Corridor and Bangerter Highway. Developers who install an EV charging station can count that parking space toward the project's minimum required parking, trimming the total stalls a structure must provide.

6. Parking Structures: Within a mixed-use, multi-family or townhome development are required to have either full coverage landscaping, walls, gates, beams, etc. surrounding all sides except the ingress/egress points in order to qualify for open space and amenity reductions. For town homes, this parking structure would serve as a place where guests/visitors and additional owner automobiles can be accommodated, to reduce the need to park on the streets. One two hundred twenty (220) volt vehicle charging station is required in every parking structure.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-38: Code current through: Ord. 26-33, passed 6-23-2026).

Full Breakdown

West Jordan's Interchange Overlay Zone (IOZ) covers land near the freeway interchanges along Mountain View Corridor (SR-85) and Bangerter Highway, adopted to promote large-scale mixed-use redevelopment around those interchanges. Under City Code section 13-6K-5-1(E)(6), any parking structure built for a mixed-use, multi-family, or townhome project inside the IOZ must include one 220-volt vehicle charging station. The same parking-structures standard also requires full-coverage landscaping, walls, gates, or beams around every side of the structure except the ingress and egress points, so the mandate sits inside a broader design package for enclosed parking, not a stand-alone charging rule.

A separate incentive in subsection (H)(7) of the same section lets any use in the IOZ that installs an electric charging station count that space toward its minimum parking requirement, alongside the solar and geothermal incentives in the same paragraph, such as a one-story height bonus for buildings with solar panels. The IOZ standards supersede the underlying zone once a property is rezoned into the overlay, and city staff review compliance during site plan and building permit review. The Community Development Director or a designee administers and enforces Title 13, the zoning title containing the IOZ chapter, under section 13-6K-6(A).

The requirement traces to Ordinance 24-36, adopted August 27, 2024, which added the current IOZ design and development standards article at section 13-6K-5-1. Because the mandate is written into the interchange overlay chapter rather than the citywide off-street parking chapter (title 13, chapter 12), it applies only to development approved into the IOZ, not to parking structures built under a conventional commercial or residential zone elsewhere in the city.

Violations & Fines

Title 13 violations, including a parking structure built without the required 220-volt charging station, are enforced under the citywide zoning penalty in section 13-4-11: each day a property is out of compliance is a separate Class C misdemeanor, prosecutable administratively under title 16 or criminally in court. Section 13-4-5 also makes it a violation to build or use a structure without required permits and approvals, and section 13-4-6 declares any title 13 violation a public nuisance.

Frequently Asked Questions

Does West Jordan require EV charging stations in new parking structures?
Yes, but only inside the Interchange Overlay Zone. City Code section 13-6K-5-1(E)(6) requires one 220-volt vehicle charging station in every parking structure built for a mixed-use, multi-family, or townhome project within the IOZ, which covers land near the Mountain View Corridor and Bangerter Highway freeway interchanges. Parking structures outside the IOZ are not subject to this specific charging mandate.
Can an EV charging space count toward my required parking?
Yes. Section 13-6K-5-1(H)(7) lets any use within the Interchange Overlay Zone that installs an electric charging station count that parking space toward the project's minimum required parking. The same subsection also grants a one-story height bonus and side and rear yard encroachments for buildings that add solar panels, so the charging credit sits alongside other sustainability incentives in the IOZ.
What happens if a developer skips the required charging station?
The Community Development Director, who administers Title 13 under section 13-6K-6(A), can require compliance during site plan and permit review. A parking structure built without the required equipment is a Title 13 violation under section 13-4-5, punishable as a Class C misdemeanor with each day of noncompliance treated as a separate offense under section 13-4-11.

Sources & Official References

Other rules in West Jordan

All West Jordan rules

Compare West Jordan to another location·View the Utah parking rules overview

Get notified when EV Charging in West Jordan, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

EV Charging in Nearby Cities

How other cities in Salt Lake County handle ev charging.

Salt Lake City, UT
Some Restrictions
West Valley City, UT
Few Restrictions