Skip to main content
CityRuleLookup

Sandy, UT Environmental Rules: Erosion Control (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Declared
Public nuisance (blowing dust, soil, sand)
Duty holder
Property owner and all responsible parties
Enforcer
City Engineer / UPDES Inspector
Nonpayment remedy
Bond forfeiture plus 50% service charge
Construction requirement
SWPPP and NOI required (§21-27-8)

Summary

Sandy declares blowing dust, soil and sand a public nuisance under §21-27-9 and makes every property owner responsible for stopping it. The City Engineer can order a landowner to treat the source, and unresolved violations can trigger bond forfeiture or a criminal case.

Declaration of Nuisance. Soil erosion caused by wind and dust storms produced thereby and blowing of dust, soil, and sand are hereby declared to be destructive of property and natural resources of the City and are harmful to the health and well-being of the residents of the City. The City Council does hereby declare conditions causing, allowing, or maintaining blowing dust, soil, or sand to be public nuisances. Duty of Landowner. To conserve property and the natural resources of the City and to prevent injurious effects of blowing dust, soil, or sand, it is the duty of the owner of real property and all responsible parties to prevent by appropriate means the blowing of dust, soil, or sand.

Source: Sandy EngineeringView official code

Full Breakdown

' When the City Engineer learns of a blowing-dust nuisance, especially one damaging streets or public property, the Engineer inspects the source and, if warranted, issues a written order to the responsible party specifying the nuisance, the required treatment, and the deadlines to start and finish it; that notice can be served in person or by certified mail. This nuisance rule works alongside the more detailed grading-permit erosion standards in §21-27-8, which require slope protection, dikes, swales or cutoff ditches on downslopes, and a Storm Water Pollution Prevention Plan (SWPPP) and Notice of Intent (NOI) for active construction sites, plus revegetation of disturbed cuts and fills within 30 days of grading and stabilization of all disturbed soil surfaces before November 1 each year.

Violations & Fines

If a landowner does not complete the City Engineer's ordered treatment on time and does not appeal, or does not comply within three days of an appeal decision, the City Attorney can bring an abatement action under §21-27-9. Any bond posted for the property may be declared forfeited for the cost of the required treatment plus a 50 percent service charge, or the City may instead pursue a criminal case against the responsible party.

Frequently Asked Questions

Is blowing dust from a construction site illegal in Sandy?
Yes. Section 21-27-9 declares conditions that cause, allow, or maintain blowing dust, soil, or sand a public nuisance, and places the duty to prevent it on the property owner and any other responsible party, regardless of whether a grading permit is active.
What can the City do if my property is causing a dust nuisance?
The City Engineer can inspect the source and issue a written order under §21-27-9 specifying the nuisance, the required treatment, and the deadlines to start and complete it, served on the responsible party in person or by certified mail to their last-known address.
What happens if I ignore the City Engineer's dust-abatement order?
The City Attorney can file an abatement action, and any bond posted for the property can be forfeited to cover the treatment cost plus a 50 percent service charge, or the City may bring a criminal case instead, under §21-27-9's enforcement provisions.

Sources & Official References

Other rules in Sandy

All Sandy rules

Compare Sandy to another location·View the Utah environmental rules overview

Get notified when Erosion Control in Sandy, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Nearby Cities

How other cities in Salt Lake County handle erosion control.

West Valley City, UT
Some Restrictions
West Jordan, UT
Some Restrictions
South Jordan, UT
Some Restrictions
Salt Lake City, UT
Some Restrictions