Salt Lake City, UT Environmental Rules: Erosion Control (2026)
Key Facts
- Governing section
- SLC Code § 18.20.210(D)
- Who must comply
- Building permit holders
- Plan deadline
- 5 days after city request
- Enforcement
- Building official or city engineer
- Duration
- Maintained for life of project
Summary
Construction permit holders in Salt Lake City must install erosion and stormwater runoff controls to keep sediment and debris from washing into streets, gutters, or storm drains.
The permit holder shall install erosion and water runoff controls sufficient to ensure that no stormwater, surface water, sediments or debris from the construction site shall drain or wash or be tracked into any public right of way or other adjacent properties, including curb and gutter, unless permission has been granted through the erosion control plan. These controls shall be sufficient to cover any contingency, including, but not limited to, seasonal storms, unseasonal storms, or methods of construction. The building official or the city engineer may require, when in his/her discretion he/she deems necessary, an erosion control plan to be submitted for approval. Such plan may be required any time during construction and must be submitted within 5 days of the request. The building official or the city engineer may suspend all work until the plan requested is approved. The permit holder will maintain all erosion control facilities throughout the life of the construction project. He/she will monitor their effectiveness after storms and make the necessary adjustments to ensure they function correctly.
E. The sidewalk and/or curb and gutter shall not be used for storage of debris, dirt or excavated materials. In addition, the sidewalks shall not be removed, blocked or otherwise rendered unusable by either the storage of construction equipment or materials or the construction procedures used, unless
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: 2026 S-21: Code current through: Ord. 40-26, passed June 16, 2026).
Full Breakdown
Salt Lake City Code section 18.20.210(D) requires every building permit holder to install erosion and water runoff controls sufficient to stop stormwater, surface water, sediment, or debris from draining, washing, or tracking off the construction site into any public right of way or adjacent property. The building official or city engineer can require a written erosion control plan on 5 days' notice and may suspend work until it's approved. The permit holder must maintain the controls for the life of the project and monitor them after storms.
Violations & Fines
The building official or city engineer can suspend the building permit until adequate erosion controls and cleaning equipment are installed (§ 18.20.210(H)); the city may also bill the property owner or permit holder for city crews' cost of removing tracked mud, dirt, or debris from streets and sidewalks, including legal fees.
Frequently Asked Questions
Does Salt Lake City require an erosion control plan for every construction site?
What happens if sediment washes off a construction site into the street?
Sources & Official References
Other rules in Salt Lake City
Compare Salt Lake City to another location·View the Utah environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Erosion Control in Nearby Cities
How other cities in Salt Lake County handle erosion control.