Provo, UT Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard minimum
- 1 foot above base flood elevation
- Applies to
- Lowest floor, including basements
- Certification required from
- Registered engineer, architect, or surveyor
- Shallow flooding zones (AO/AH)
- Extra 1 ft freeboard on top of ponding depth
- Enforcing office
- Floodplain Administrator
Summary
In Provo's Special Flood Hazard Area, the lowest floor of every new structure, including basements, must sit at least one foot above the base flood elevation, and a licensed engineer, architect, or surveyor must certify the elevation to the Floodplain Administrator.
Lowest floors (including basements) of all structures in the SFHA must be a minimum of one (1) foot above the BFE. A registered professional engineer, architect, or land surveyor shall submit certified elevations to the Floodplain Administrator that the standards of this Section are satisfied.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-17, passed June 9, 2026).
Full Breakdown
180(11)(k) sets the city's one-foot freeboard standard: lowest floors, including basements, of all structures in the Special Flood Hazard Area (SFHA) must be a minimum of one foot above the base flood elevation (BFE), verified by a registered professional engineer, architect, or land surveyor who submits certified elevations to the Floodplain Administrator. Related standards in the same subsection push other risk features even higher: any structural storage for chemicals, explosives, or flammable liquids must sit one foot above the BFE, new public surface improvements like roads and manhole rims must be built one foot above the BFE, and parking lot elevations cannot be more than six inches below the BFE.
For areas of shallow flooding (AO/AH zones), Subsection (16) layers on an additional foot of freeboard beyond the mapped or assumed ponding depth. Before any of this construction can proceed, Subsection (9) requires an approved floodplain development permit from Provo City, and issuance of a certificate of occupancy in the SFHA is withheld until either a FEMA letter of map change removes the structure from the flood zone or an elevation certificate confirms the structure sits above the base flood level. Variances from these elevation standards go to the Board of Adjustment, which can grant relief only on a showing of good cause and exceptional hardship, and any variance recipient must receive written notice that flood insurance costs will reflect the increased risk of the lower floor elevation.
Violations & Fines
Building below the required freeboard elevation without an approved variance blocks issuance of both the floodplain development permit and the certificate of occupancy; the Floodplain Administrator will not sign off until a registered engineer, architect, or surveyor certifies the structure meets the one-foot elevation standard. Unauthorized development within a designated floodway that would raise base flood levels cannot be permitted or varianced at all.
Frequently Asked Questions
How much above base flood elevation must Provo homes be built?
Who verifies the elevation before I get a permit?
Can I get a variance to build below the base flood elevation?
Sources & Official References
Other rules in Provo
Compare Provo to another location·View the Utah environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in Utah County handle flood elevation requirements.