St. George, UT Environmental Rules: Stormwater Management (2026)
Key Facts
- Grading permit trigger
- 1 acre or more disturbed
- Permit expires unstarted
- 60 days
- Illicit MS4 discharges
- prohibited
- Violation classification
- class B misdemeanor
- Performance bond
- 120% of BMP cost
Summary
St. George requires a grading permit before disturbing one acre or more of land, backed by a state notice of intent and a city-approved storm water pollution prevention plan under chapter 9-14 of the city code.
Every person shall obtain a grading permit for any land disturbance or grading activity on land of one (1) acre or more.
B. Exemptions: The following activities are exempt from the permit requirement:
1. Any emergency activity that is immediately necessary for the protection of life, property, or natural resources.
2. Existing nursery and agricultural operations conducted as a permitted main or accessory use.
3. Additions or modifications to existing single-family structures.
C. Application For A Grading Permit: Each application shall include the following:
1. Name of applicant;
2. Business or residence address of applicant;
3. Name, address or telephone number of the owner of the property of record;
4. Address and legal description of subject property including the tax reference number and parcel number of the subject property;
5. Name, address and telephone number of the contractor and any subcontractor(s) who shall perform the land disturbing/grading activity and who shall implement the erosion and sediment control plan;
6. A statement indicating the nature, extent and purpose of the land disturbing/grading activity, including the size of the area for which the permit shall be applicable and a schedule for the starting and completion dates of the land disturbing/grading activity;
7. A diagram with contours and cross sections showing the extent of grading and BMPs;
8. Drainage study, if required by city;
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-062, passed August 6, 2026).
Full Breakdown
Chapter 9-14 of the St. George City Code governs storm water management citywide. Anyone disturbing one acre or more (or less if part of a common development plan) must obtain a grading permit, file a Utah notice of intent, and submit a storm water pollution prevention plan before work begins. Dumping anything other than storm water into the municipal separate storm sewer system is banned outright, with narrow exceptions like water line flushing and dechlorinated pool water. The city inspects BMPs on public and private sites that drain to its system and can issue notices of violation, stop-work orders, and civil penalties.
Violations & Fines
Violating the chapter, a permit, or a city order is a class B misdemeanor, with each day counted as a separate offense; the city can also issue civil penalties, cease-and-desist orders, and recover cleanup costs plus liens against the property.
Frequently Asked Questions
Do I need a permit to grade my St. George lot?
Can I drain pool water into the street gutter?
Sources & Official References
Other rules in St. George
Compare St. George to another location·View the Utah environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.