Skip to main content
CityRuleLookup

St. George, UT Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Grading permit trigger
1 acre or more disturbed
Permit expires unstarted
60 days
Illicit MS4 discharges
prohibited
Violation classification
class B misdemeanor
Performance bond
120% of BMP cost

Summary

St. George requires a grading permit before disturbing one acre or more of land, backed by a state notice of intent and a city-approved storm water pollution prevention plan under chapter 9-14 of the city code.

Every person shall obtain a grading permit for any land disturbance or grading activity on land of one (1) acre or more.

B. Exemptions: The following activities are exempt from the permit requirement:

1. Any emergency activity that is immediately necessary for the protection of life, property, or natural resources.

2. Existing nursery and agricultural operations conducted as a permitted main or accessory use.

3. Additions or modifications to existing single-family structures.

C. Application For A Grading Permit: Each application shall include the following:

1. Name of applicant;

2. Business or residence address of applicant;

3. Name, address or telephone number of the owner of the property of record;

4. Address and legal description of subject property including the tax reference number and parcel number of the subject property;

5. Name, address and telephone number of the contractor and any subcontractor(s) who shall perform the land disturbing/grading activity and who shall implement the erosion and sediment control plan;

6. A statement indicating the nature, extent and purpose of the land disturbing/grading activity, including the size of the area for which the permit shall be applicable and a schedule for the starting and completion dates of the land disturbing/grading activity;

7. A diagram with contours and cross sections showing the extent of grading and BMPs;

8. Drainage study, if required by city;

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-062, passed August 6, 2026).

Full Breakdown

Chapter 9-14 of the St. George City Code governs storm water management citywide. Anyone disturbing one acre or more (or less if part of a common development plan) must obtain a grading permit, file a Utah notice of intent, and submit a storm water pollution prevention plan before work begins. Dumping anything other than storm water into the municipal separate storm sewer system is banned outright, with narrow exceptions like water line flushing and dechlorinated pool water. The city inspects BMPs on public and private sites that drain to its system and can issue notices of violation, stop-work orders, and civil penalties.

Violations & Fines

Violating the chapter, a permit, or a city order is a class B misdemeanor, with each day counted as a separate offense; the city can also issue civil penalties, cease-and-desist orders, and recover cleanup costs plus liens against the property.

Frequently Asked Questions

Do I need a permit to grade my St. George lot?
Only if the disturbed area reaches one acre, or less when it's part of a larger common development plan; smaller single-family additions are exempt.
Can I drain pool water into the street gutter?
Yes, but only if it's dechlorinated to roughly one ppm or less: otherwise it counts as a prohibited discharge into the storm sewer system.

Sources & Official References

Other rules in St. George

All St. George rules

Compare St. George to another location·View the Utah environmental rules overview

Get notified when Stormwater Management in St. George, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.