Skip to main content
CityRuleLookup

Orem, UT Environmental Rules: Flood Zones (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

FEMA flood zone rules in Orem, UT, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Permit required
Before any development in a mapped flood hazard area
Elevation standard
1 foot above base flood elevation
Reviewing body
Development Review Committee
Variance authority
Board of Adjustment
Penalty
Class C misdemeanor
Program
National Flood Insurance Program (FEMA)

Summary

Orem requires a development permit before any construction or land-disturbing work begins in a mapped area of special flood hazard. City Code 10-4-3 covers plats, site plans, and building permits, while Section 10-5-2 sets numeric elevation standards under the National Flood Insurance Program.

A development permit (a preliminary plat, site plan and or building permit as applicable) shall be obtained before construction or development begins within any area of special flood hazard established in Section 10-3-2. ... Residential Construction. New construction and substantial improvement of any residential structure shall have the lowest floor, including basement, machinery and equipment, elevated to one foot above the base flood elevation.

Full Breakdown

Orem opted into the National Flood Insurance Program administered by FEMA, and Chapter 10 of the City Code, Flood Damage Prevention, implements that commitment locally under the authority of Utah Code 10-9a-505. Before construction or development begins within any FEMA-mapped area of special flood hazard, City Code 10-4-3 requires a development permit, which can take the form of a preliminary plat, site plan, or building permit depending on the project. The application must show the elevation of the lowest floor of proposed structures, any floodproofing elevation, and how the project affects nearby watercourses, and a registered professional engineer or architect must certify that floodproofing on non-residential buildings meets the standard in Section 10-5-2(B).

Section 10-5-2 sets the core numeric rule: new construction and substantial improvement of a residential structure must have its lowest floor, including the basement, elevated at least one foot above the base flood elevation, certified by a registered engineer, architect, or land surveyor. Non-residential buildings must meet the same one-foot elevation or be floodproofed watertight to that height. The Development Review Committee reviews every permit for adverse effects on flood-carrying capacity, and the Floodplain Administrator keeps the permit record on file. Encroachments, fill, and new construction are barred in a mapped floodway unless engineering analysis shows no increase in base flood levels, and a floodway may not raise the base flood level more than one foot.

The Board of Adjustment hears variance requests, and any decision can be appealed to the courts. Violating Chapter 10, including building without the required permit or below the mandated elevation, is a class C misdemeanor under Section 10-5-6.

Violations & Fines

Constructing, extending, or substantially improving a structure in a mapped flood hazard area without the Section 10-4-3 development permit, or below the one-foot-above-base-flood-elevation standard in Section 10-5-2, is a class C misdemeanor under City Code 10-5-6, and the City can pursue other lawful remedies to abate the violation.

Frequently Asked Questions

Do I need a permit to build in an Orem flood zone?
Yes. City Code 10-4-3 requires a development permit, a preliminary plat, site plan, or building permit as applicable, before any construction or development begins within a FEMA-mapped area of special flood hazard in Orem, and the Floodplain Administrator keeps the application on file.
How high above the flood level must a new home be built?
City Code 10-5-2 requires the lowest floor, including the basement, of any new or substantially improved residential structure to be elevated at least one foot above the base flood elevation, certified by a registered engineer, architect, or land surveyor.
What happens if someone builds in a floodway without approval?
It is a class C misdemeanor under City Code 10-5-6. Encroachments including fill and new construction are barred in an adopted floodway unless engineering analysis proves the project will not raise base flood levels, and the City can pursue other legal remedies as well.

Sources & Official References

Other rules in Orem

All Orem rules

Compare Orem to another location·View the Utah environmental rules overview

Get notified when Flood Zones in Orem, UT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Zones in Nearby Cities

How other cities in Utah County handle flood zones.

Eagle Mountain, UT
Some Restrictions
Provo, UT
Some Restrictions
Lehi, UT
Significant Restrictions