Salt Lake County, UT Environmental Rules: Stormwater Management (2026)
Key Facts
- Governing section
- County Code §17.22.050
- Design sign-off
- Utah-licensed professional engineer's seal
- Performance goal
- Post-construction runoff at preconstruction levels
- Exceptions
- Waiver or county engineer exemption only
- Enforcement path
- Land disturbance permit and inspections, Part VI
- Applies to
- Unincorporated Salt Lake County development sites
Summary
Development sites in unincorporated Salt Lake County must meet the post-construction stormwater performance criteria in County Code §17.22.050 unless the county engineer grants a waiver or determines the site exempt. Storm drain designs connected to the county system need a Utah-licensed professional engineer's supervision and seal, and post-construction runoff must be brought back toward preconstruction levels.
General performance criteria for stormwater management. Unless a site is granted a waiver or determined by the county engineer to be exempt, the following post-construction performance criteria shall be addressed for stormwater management at all sites:1.The design of storm drain systems within the boundaries of or discharging into a county storm drain system shall be supervised by a Utah registered professional engineer, and shall carry the seal of the supervising professional engineer.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 49).
Full Breakdown
§17.22.050 applies its performance criteria to all sites by default. The only exits are a waiver or a determination by the county engineer that the site is exempt, so an applicant cannot simply decide the criteria do not apply. Under subsection (B)(1), the design of any storm drain system within the boundaries of, or discharging into, a county storm drain system must be supervised by a Utah registered professional engineer and must carry that engineer's seal. A design without a licensed engineer's seal cannot be approved for anything that touches county drainage infrastructure.
Under subsection (B)(2), systems must control peak flow rates and reduce post-construction runoff back toward preconstruction levels, using pervious areas and infiltration where practical, with the county's adopted BMP manuals supplying the accepted design methods. Sites near sensitive resources such as cold-water fisheries or water supply reservoirs face added performance criteria beyond that baseline. The ordinance also directs applicants to consult the county engineer on design requirements before or during site design, not after plans are drawn, and subsection (C) bars runoff from one lot exceeding pre-existing rates onto a neighboring lot.
Violations & Fines
The chapter's core compliance standard sits in §17.22.050(C): runoff rates from one lot to another may not exceed pre-existing conditions. Enforcement runs through the county's land disturbance permit and inspection program under Part VI of the chapter rather than through a standalone penalty in this section.
Frequently Asked Questions
Does every project have to meet these stormwater criteria?
Who must design a stormwater system in Salt Lake County?
What performance level do new systems have to hit?
Are some sites held to stricter standards?
Sources & Official References
Other rules in Salt Lake County
Compare Salt Lake County to another location·View the Utah environmental rules overview