Skip to main content
CityRuleLookup

Racine County, WI Environmental Rules: Erosion Control (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Trigger
Substantial grading or erosion hazard
Who reviews
Racine County Land Conservation Office
Plan preparer
Qualified professional required
Standard used
USDA-SCS technical guide

Summary

Racine County requires engineer-prepared erosion and sedimentation control plans, reviewed by the Land Conservation Office, before approving a plat that involves substantial cutting, clearing, or grading.

City-specific rules exist: Burlington has its own erosion control rules that differ from Racine County's county-level regulations. If you live in Burlington, check the city-specific page instead.

An approving authority shall, upon determining from a review of the plat that the soil, slope, vegetation and drainage characteristics of the site are such as to require substantial cutting, clearing, grading or other earth-moving operations in the development of the subdivision or to otherwise entail a severe erosion hazard, require the subdivider to provide soil erosion and sedimentation control plans and specifications... reviewed by the Racine County Land Conservation Office, using the U.S.D.A.-S.C.S. Technical Guide for the State of Wisconsin or other acceptable engineering standards.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 33).

Full Breakdown

This isn't a standalone grading permit: it's a plat-approval condition. When county review finds a subdivision site's soil, slope, vegetation, or drainage will need substantial cutting, clearing, grading, or other earth-moving, or otherwise poses a severe erosion hazard, the subdivider must submit soil erosion and sedimentation control plans prepared by a qualified professional. The Racine County Land Conservation Office reviews those plans against USDA Soil Conservation Service technical guidance or other accepted engineering standards before the plat can move forward, and detailed grading and drainage plans can be required alongside them.

Violations & Fines

A plat triggering this review doesn't get final approval without Land Conservation Office sign-off on the erosion and sedimentation control plans; skipping the submission stalls the subdivision approval itself.

Frequently Asked Questions

Is there a separate 'grading permit' in Racine County?
No standalone permit: grading and drainage control is enforced as a condition of subdivision plat approval, reviewed by the county's Land Conservation Office.
What triggers the erosion control plan requirement?
The approving authority finding, from plat review, that the site's soil, slope, or drainage will need substantial cutting, clearing, grading, or earth-moving, or poses a severe erosion hazard.

Sources & Official References

Other rules in Racine County

All Racine County rules

Compare Racine County to another location·View the Wisconsin environmental rules overview

Get notified when Erosion Control in Racine County, WI changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Erosion Control in Cities Across Racine County