Acworth, GA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Residential freeboard
- 3 ft above base flood elevation, or 1 ft above future-conditions
- Non-residential freeboard
- 1 ft above base flood elevation minimum
- Flood vent rule
- 1 sq in net opening area per sq ft enclosed
- Administering department
- Acworth Public Works Department
- Max daily civil penalty
- $1,000 per day unremedied
- Governing sections
- Acworth Code §§ 50-78, 50-102
Summary
Acworth requires new construction and substantial improvements inside the future-conditions floodplain to elevate the lowest floor at least three feet above base flood elevation, or one foot above the future-conditions flood elevation if that figure is higher, once the site clears the city's no-rise floodplain standards.
"Base flood elevation" means the highest water surface elevation anticipated at any given point during the base flood. ... If all of the requirements of sections 50-93, 50-94 and 50-95 have been met, all new construction shall have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation or one foot above the future-conditions flood elevation, whichever is higher.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 27).
Full Breakdown
Acworth defines "base flood elevation" in § 50-78 as "the highest water surface elevation anticipated at any given point during the base flood," with the base flood meaning the 100-year, one-percent-annual-chance flood. Section 50-102(1)a builds Acworth's local freeboard on top of that federal baseline: once a residential project has satisfied the general floodplain-encroachment standards of §§ 50-93, 50-94 and 50-95, all new construction must have the lowest floor, including basement, elevated no lower than three feet above the base flood elevation, or one foot above the future-conditions flood elevation, whichever is higher.
That three-foot figure is a local add-on above the National Flood Insurance Program minimum, and it applies to substantial improvements of existing homes as well as new construction. Non-residential buildings get a lighter one-foot standard under § 50-102(2), with a flood-proofing alternative to elevation if a professional engineer or architect certifies the design. Solid perimeter foundation walls used to reach the required elevation must carry flood-vent openings sized under § 50-101(5): a minimum of two openings totaling one square inch of net area per square foot of enclosed area below the lowest floor, with the bottom of every opening no higher than one foot above grade.
The public works department administers the article and reviews the as-built elevation certificate required after floor completion under § 50-87, and can hold up further construction if the certification shows a deficiency.
Violations & Fines
Section 50-80 layers city enforcement onto the elevation requirement: a written notice of violation, a stop-work order, withheld certificate of occupancy, or permit suspension come first, and if the deficiency isn't cured within the notice period, a civil penalty of up to $1,000 per day may follow, plus criminal prosecution in Acworth Municipal Court carrying a fine up to $1,000 or up to 60 days in jail for intentional, flagrant violations.
Frequently Asked Questions
How high above the base flood elevation must I build in Acworth?
What exactly is "base flood elevation"?
Do I need an elevation certificate?
What if my elevated wall design does not have flood vents?
Sources & Official References
Other rules in Acworth
Compare Acworth to another location·View the Georgia environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.