Acworth, GA Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
1 acre disturbed or 5,000 sq ft impervious cover
Runoff retention standard
Retain first 1.0 inch of rainfall on-site
Water-quality fallback
Remove 80% of TSS from 1.2-inch storm
Performance bond
110% of construction cost required before LDA
Administering department
Acworth Public Works Department
Max daily penalty
$1,000 per day unremedied violation

Summary

Any Acworth land-development project disturbing an acre or adding 5,000 square feet of impervious cover needs a public works stormwater permit before grading starts, and the design must retain the site's first inch of rainfall on-site through runoff-reduction measures under the city's post-development standards.

No owner or developer shall perform any land development activities without first meeting the requirements of this article or any applicable ordinances prior to commencing the proposed activity. ... (A)Runoff reduction. The stormwater management system shall be designed to retain the first 1.0 inch of rainfall on the site using runoff reduction methods, to the maximum extent practicable.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 27).

Full Breakdown

Article IV of Chapter 50, rewritten by Ord. No. " A single-family or duplex lot outside a subdivision, and additions to an existing single-family or duplex home, are exempt. The permit package must include a stormwater concept plan reviewed at a pre-application consultation meeting, a full stormwater management plan stamped by a Georgia-licensed professional engineer, and, where the city requires long-term upkeep, a recorded inspection and maintenance agreement binding future owners. 2-inch storm, only where runoff reduction is shown infeasible. Stream-channel protection layers on top of that: 24-hour extended detention of the one-year storm, plus peak-discharge control out to the 25-year, 24-hour storm for overbank flooding and safe conveyance of the 100-year storm for extreme-flood protection. Performance bonds equal to 110 percent of construction cost secure completion before the city releases a project.

Violations & Fines

Section 50-117 gives the city the same enforcement ladder as its floodplain article: written notice of violation, then a stop-work order, withheld certificate of occupancy, or permit suspension, revocation, or modification, and if the applicant still hasn't cured the deficiency, a civil penalty up to $1,000 per day the violation continues, plus criminal prosecution for intentional or flagrant violations carrying a fine up to $1,000 or up to 60 days in jail, with each day a separate offense.

Frequently Asked Questions

Does every construction project in Acworth need a stormwater permit?
No. Section 50-113 requires a permit only for land-development activity meeting the article's applicability thresholds: 5,000 square feet or more of new impervious cover, one acre or more of disturbance, or any size project the city designates a pollution hotspot. A single-family or duplex lot that isn't part of a subdivision, or an addition to one, is exempt.
What design standard does my engineer have to meet?
For plans submitted on or after January 1, 2021, § 50-114 requires the stormwater system to retain the first 1.0 inch of rainfall on-site using runoff-reduction methods to the maximum extent practicable. Only if that's shown infeasible does the older water-quality standard, treating 80 percent of TSS from a 1.2-inch storm, apply instead.
Who reviews and approves the stormwater plan?
The Acworth Public Works Department, after a required pre-application consultation meeting on a concept plan. The final stormwater management plan must be stamped by a professional engineer licensed in Georgia and follow the checklist in the city's adopted Georgia Stormwater Management Manual.
What if my stormwater facility isn't maintained after construction?
Section 50-116 lets the city issue a written notice to the responsible party named in the recorded inspection and maintenance agreement; if they don't fix it, the city can perform the repair itself and place the cost as a lien on the property, collected like an ad valorem tax bill.

Sources & Official References

Other rules in Acworth

All Acworth rules

Compare Acworth to another location·View the Georgia environmental rules overview

Get notified when Stormwater Management in Acworth, GA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.