Skip to main content
CityRuleLookup

Bellingham, WA Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

Freeboard required
1 foot above BFE
Applies to
new construction, substantial improvement
Data source
FEMA FIRM maps
Permit needed
development permit, Public Works
Max fine
$1,000 misdemeanor

Summary

New and substantially improved homes in Bellingham's mapped flood hazard areas must elevate the lowest floor at least one foot above the FEMA base flood elevation.

17.76.180 Residential construction. A. New construction and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated to at least one foot above the base flood elevation. The long axis of the foundation must be aligned with the flood flow.

View official code

Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 2026-06-015, passed June 1, 2026).

Full Breakdown

Bellingham's floodplain chapter requires new construction and substantial improvements to residential structures within the city's areas of special flood hazard, set by FEMA Flood Insurance Rate Maps along Bellingham Bay, Whatcom Creek and other Whatcom County, Washington waterways, to elevate the lowest floor, including any basement, at least one foot above the base flood elevation, with the foundation's long axis aligned to flood flow. Nonresidential buildings get a floodproofing alternative instead. A development permit from the Public Works Director is required before any work begins, and the one-foot freeboard is a Bellingham add-on above the bare FEMA minimum, adopted within the state-approved floodplain framework.

Violations & Fines

Building without the required elevation or the development permit is a misdemeanor punishable by up to $1,000, plus a civil penalty of up to $100 per day until the violation is corrected.

Frequently Asked Questions

How much freeboard does Bellingham require above base flood elevation?
At least one foot. New construction and substantial improvements to residential structures in mapped flood hazard areas must have the lowest floor, including any basement, one foot above the base flood elevation.
What if my property is a commercial building instead?
Nonresidential structures can floodproof to one foot above the base flood level instead of elevating, but must be certified watertight by a registered engineer or architect.

Sources & Official References

Other rules in Bellingham

All Bellingham rules

Compare Bellingham to another location·View the Washington environmental rules overview

Get notified when Flood Elevation Requirements in Bellingham, WA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.