Benton County, OR Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Residential freeboard
- 18 inches above BFE
- Non-residential freeboard
- 18 inches above BFE (or floodproof)
- Critical facilities
- 3 ft above BFE or 500-yr flood
- Datum
- mean sea level (NAVD 1988)
- Certification required
- Pre/Mid/Post-Construction Elevation Certificates
- Administered by
- County Floodplain Administrator
Summary
Unincorporated Benton County requires the lowest floor of new or substantially improved residential structures in a special flood hazard area to sit at least 18 inches above the Base Flood Elevation (BFE), the height of base-flood waters expressed in feet above mean sea level. Critical facilities such as schools and fire stations must clear the BFE by a full 3 feet, or the 500-year flood height, whichever is higher.
(5)"Base Flood Elevation" means the height of the flood waters during a base flood at points along the water course, expressed in feet above mean sea level. ... Critical facilities constructed within the SFHA shall have the lowest floor elevated 3 feet above the Base Flood Elevation (BFE) or to the height of the 500-year flood, whichever is higher. ... (1)Where allowed, new construction, conversion to, and substantial improvement of any residential structure (as defined in BCC 83.020) shall have the lowest floor, including basement, elevated a minimum of 18 inches above the Base Flood Elevation (BFE).
Full Breakdown
035. 020 to include dwellings, accessory dwelling units, manufactured dwellings, and accessory living areas, must have the lowest floor, including any basement, elevated a minimum of 18 inches above the BFE. That freeboard exceeds the bare federal NFIP minimum of at-BFE construction. 610, with a floodproofing alternative certified by a registered engineer or architect in place of elevation. 500(3): they must be sited outside the special flood hazard area whenever a feasible alternative exists, and if built within it, the lowest floor must clear the BFE by 3 feet or reach the 500-year flood elevation, whichever is higher, with access routes elevated to the same standard. 260, reviewed and maintained by the county's Floodplain Administrator, a role assigned to the Planning Official.
Violations & Fines
Building below the required freeboard, or skipping the Pre-Construction Elevation Certificate BCC 83.260 requires before a building permit issues, is treated as noncompliance with the Floodplain Management Overlay ordinance and reviewed by the Floodplain Administrator alongside the County Engineer before any floodplain development permit is issued. A structure built without the documented elevation is presumed in violation under BCC 83.020(57) until the required certification is produced.
Frequently Asked Questions
How far above the base flood elevation must a new home be built in unincorporated Benton County?
What counts as the Base Flood Elevation?
Do schools and fire stations get a stricter elevation standard?
What documentation proves a structure meets the freeboard requirement?
Sources & Official References
Other rules in Benton County
Compare Benton County to another location·View the Oregon environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.