Calvert County, MD Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard requirement
- Base flood elevation plus one foot (§46-5)
- Basements
- Prohibited in all floodplain zones (§46-21)
- Certification required
- Registered engineer or surveyor elevation certificate (§46-7D)
- V Zone standard
- Pilings or columns, no slab foundations (§46-26)
- Small accessory exemption
- Up to 300 sq ft by right (§46-37)
- Larger accessory permit
- 300-600 sq ft needs conditioned permit (§46-10)
- Variance authority
- Calvert County Board of Appeals (§46-40)
Summary
Every new or substantially improved building in a Calvert County floodplain must have its lowest floor raised to the flood protection elevation, defined as the base flood elevation plus one foot of freeboard. Basements are banned outright, and even footprint expansions that fall short of a substantial improvement must still meet the same elevation standard before the county will sign off.
FLOOD PROTECTION ELEVATION (FPE) The elevation of the base flood plus one foot freeboard. ... All new or substantially improved residential and nonresidential structures shall have the lowest floor elevated to or above the flood protection elevation. Basements are not permitted. In nontidal and tidal floodplains, horizontal expansions which increase the footprint and that are less than substantial shall also have the lowest floor of the expansion elevated to or above the flood protection elevation.
Full Breakdown
Chapter 46 defines the Flood Protection Elevation as the base flood elevation, the one-hundred-year flood level shown on FEMA's Flood Insurance Study, plus one foot of freeboard added for safety against calculation error, wave action and settlement (§ 46-5). Section 46-21 then makes that elevation the mandatory floor: every new or substantially improved residential and nonresidential structure in a nontidal or tidal floodplain must have its lowest floor, including any horizontal footprint expansion that is less than a substantial improvement, built at or above the flood protection elevation, and basements are not permitted anywhere in the floodplain.
A registered surveyor or professional engineer must certify the as-built lowest floor elevation on a FEMA elevation certificate before the county will issue a certificate of occupancy, and work done before that certification is at the applicant's own risk (§ 46-7D). In the coastal high-hazard V Zone the standard is stricter still: structures must sit on pilings or columns with the lowest horizontal structural member at or above the flood protection elevation, slab foundations are prohibited, and any enclosed space below that elevation may only be used for parking, storage or building access under a signed nonconversion agreement (§§ 46-26, 46-33).
Accessory structures and attached or detached garages get narrow, size-based exemptions from full elevation, up to 300 square feet by right and up to 600 square feet with a conditioned permit, but anything larger must meet the same flood protection elevation or obtain a variance from the Board of Appeals (§§ 46-10, 46-37, 46-40).
Violations & Fines
Building below the required flood protection elevation, or finishing a basement in the floodplain, violates Chapter 46 and is subject to a written notice, a possible stop-work order carrying a $500-per-day fine, and a follow-up citation capped at $10,000 in total civil penalties for related violations (§ 46-12). The Federal Insurance Administrator is notified of any fined violation, and a noncompliant structure can be denied new or renewed National Flood Insurance coverage (§ 46-12F).
Frequently Asked Questions
How high must I build above the flood in Calvert County?
Can I build a basement on floodplain property in Calvert County?
Are sheds and garages exempt from the elevation rule?
Sources & Official References
Other rules in Calvert County
Compare Calvert County to another location·View the Maryland environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.