Skip to main content
CityRuleLookup

Charleston, SC Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Residential freeboard, new construction
2 feet above base flood elevation
Residential freeboard, substantial improvement
1 foot above base flood elevation
Non-residential option
2 ft elevation or certified flood-proofing
Certifying professional
Registered engineer or architect required
Foundation ban effective date
January 1, 2024, certain FEMA diagrams
Administering officials
Floodplain manager, chief building official

Summary

Charleston requires new residential construction in a special flood hazard area to elevate its lowest floor at least two feet above the base flood elevation, one foot higher than FEMA's minimum. City Code § 27-117(1) sets that freeboard standard, and non-residential buildings must either meet the same two-foot elevation or be certified flood-proofed by a licensed engineer or architect under § 27-117(2).

(1)Residential construction. New construction shall have the lowest floor, including basement, or the applicable structural member elevated at least two (2) feet above the level of base flood elevation prescribed for that zone. Substantial improvement of any residential structure shall have the lowest floor, including basement, or the applicable structural member elevated at least one (1) foot above the level of the base flood elevation prescribed for that zone.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 114 | Zoning: Supplement 25).

Full Breakdown

§ 27-117(1) turns that safety margin into a hard number for new residential construction: the lowest floor, including any basement, or the lowest structural member must sit at least two feet above the base flood elevation shown for that zone on the Charleston Flood Insurance Rate Map. A substantial improvement to an existing residential structure only needs one foot of freeboard above base flood elevation, a lower bar than new construction. § 27-116(a)(2) folds the freeboard into the general construction standard, requiring electrical, heating, plumbing, and HVAC equipment to be designed or located so floodwater cannot enter or accumulate during a base flood plus the applicable freeboard.

Beginning January 1, 2024, § 27-116(c) also bans several FEMA-diagrammed foundation types for new single-family dwellings citywide in the regulatory floodplain, on top of the elevation requirement, and the floodplain manager reviews elevation certificates to confirm the foundation type used matches what the ordinance allows.

Violations & Fines

Building below the required freeboard, or without the elevation or flood-proofing certification § 27-117 demands, is a misdemeanor under § 27-111: a conviction carries the punishment set in § 1-16, plus all costs and expenses of the case. The floodplain manager and chief building official can also withhold or revoke permits and certificates of occupancy, under §§ 27-112 and 27-113, until a registered engineer or architect certifies the required elevation or flood-proofing has been met.

Frequently Asked Questions

How much freeboard does Charleston require above base flood elevation?
New residential construction must have its lowest floor, including any basement, at least two feet above the base flood elevation for that zone under § 27-117(1). A substantial improvement to an existing home only needs one foot of freeboard, while non-residential buildings can choose the same two-foot elevation or FEMA-standard flood-proofing certified by a licensed engineer or architect under § 27-117(2).
Who certifies that a Charleston building meets the flood elevation rule?
A registered professional engineer or architect licensed in South Carolina must certify flood-proofed non-residential structures under § 27-117(2), and the floodplain manager reviews elevation certificates for new residential construction to confirm compliance with § 27-116(c)'s foundation restrictions. The chief building official administers the division alongside the floodplain manager under § 27-112.
What happens if a Charleston structure is built below the required elevation?
It is a misdemeanor under § 27-111, punishable under the city's general penalty in § 1-16, and the applicant also pays all costs and expenses of the case. The floodplain manager and chief building official can withhold permits, certificates of occupancy, or other approvals until an engineer or architect certifies the elevation or flood-proofing required by § 27-117.

Sources & Official References

Other rules in Charleston

All Charleston rules

Compare Charleston to another location·View the South Carolina environmental rules overview

Get notified when Flood Elevation Requirements in Charleston, SC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Charleston County handle flood elevation requirements.

North Charleston, SC
Significant Restrictions