Craighead County, AR Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Governing section
- Craighead County Code § 1200.00(16)
- Freeboard required
- 1 foot above base flood elevation
- Floodway rule
- No lots or building sites permitted
- BFE source
- FEMA Flood Insurance Rate Map
- Approving authority
- County Judge, with Road Committee review
Summary
For subdivision development in unincorporated Craighead County, § 1200.00(16) bars any plat with lots or building sites in the floodway and requires new structures in the floodplain to have their finished floor at least one foot above the FEMA-certified base flood elevation.
(16) Flood Hazard Areas. A flood hazard area is one subject to a base flood as determined by the Federal Emergency Management Agency (FEMA) identified on its Flood Insurance Rate Map (FIRM). iii) No plat of a subdivision shall be approved that contains lots or building sites in the floodway. ... iv) When a portion of a land development contains portions of floodplain, they shall be clearly delineated on the plat. No structures shall be constructed in the floodplain unless the base flood elevation certification has been approved by the County and the finished floor of the structure is 1 foot above BFE.
Full Breakdown
00 of the Craighead County Code sets the procedures and minimum design standards a developer must meet before a road or subdivision is accepted into the county road system, and its flood hazard areas provision, item (16), applies to that subdivision process. The county defines a flood hazard area as one subject to a base flood as determined by the Federal Emergency Management Agency and identified on FEMA's Flood Insurance Rate Map. Two hard rules follow from that determination. First, no plat of a subdivision can be approved if it contains lots or building sites located in the floodway itself, the channel and adjacent area that carries floodwaters during a base flood.
Second, when a land development contains portions of the floodplain outside the floodway, that area must be clearly delineated on the plat, and no structure can be built there unless the base flood elevation has been certified and approved by the county and the structure's finished floor sits at least one foot above that certified base flood elevation. This freeboard requirement is reviewed as part of the county's Preliminary Plat and Detailed Construction Plan approval process, administered by the County Judge with input from the Quorum Court Road Committee, before any final plat can be filed with the Circuit Clerk. 00.
Violations & Fines
A subdivision plat that places lots or building sites in the floodway cannot be approved at all, and a structure in the floodplain built without an approved base flood elevation certification or without the required one-foot freeboard above BFE is out of compliance with § 1200.00, blocking acceptance of the road and improvements into the county system and exposing the developer to the county's general plat-approval remedies.
Frequently Asked Questions
How high above base flood elevation must a new structure be built in unincorporated Craighead County?
Can a subdivision plat include lots inside the floodway?
Who certifies the base flood elevation for a Craighead County development?
Sources & Official References
Other rules in Craighead County
Compare Craighead County to another location·View the Arkansas environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.