St. Clair County, IL Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Freeboard standard
- 2 feet above base flood elevation
- Applies to new builds over
- $1,000 value or 70 sq ft
- Fill extension required
- At least 15 feet beyond foundation
- Enclosed area vents
- 1 sq in per sq ft of area
- Non-conversion agreement triggers at
- 4 feet enclosure height
- Mobile home tie-down rule
- 77 Ill. Adm. Code 870
Summary
St. Clair County sets its flood protection elevation, the height a building must clear, at the base flood elevation plus two feet of freeboard. Every new floodplain building, substantially damaged repair, manufactured home, or travel trailer left in place over 180 days must have its lowest floor, and all mechanical and electrical equipment, built at or above that two-foot-freeboard elevation.
"FLOOD PROTECTION ELEVATION" or "FPE" means the elevation of the base flood plus two (2) feet of freeboard at any given location in the floodplain. ... 13-1-7 PROTECTING BUILDINGS. In addition to the damage prevention requirements of Section 13-1-6, all buildings located in the floodplain shall be protected from flood damage below the flood protection elevation. ... the lowest floor and all electrical, heating, ventilating, plumbing, and air conditioning equipment and utility meters shall be located at or above the flood protection elevation.
Full Breakdown
Section 13-1-2 of the County Floodplain Code defines "Flood Protection Elevation" or "FPE" as the base flood elevation plus two feet of freeboard, and Section 13-1-7 makes that FPE the protection standard for buildings in the floodplain. The two-foot buffer applies to new construction valued over $1,000 or larger than 70 square feet, repairs to a substantially damaged building, alterations that add more than 20% of floor area or equal 40% of the building's fair market value, a manufactured home placed on a new or existing site, a travel trailer or RV kept on site more than 180 days a year, and any repetitive-loss structure.
A building may meet the standard by permanent fill, with the lowest floor and all mechanical equipment at or above the FPE and fill extending at least 15 feet beyond the foundation, or by elevation on stilts, piles, or open foundation walls, with the lowest floor and all electrical, heating, plumbing, and air conditioning equipment and utility meters at or above the FPE. Enclosed areas below the FPE must allow floodwater to pass through openings sized at one square inch per square foot of enclosed area, may only be used for parking or building access, and require a recorded non-conversion agreement once the enclosure reaches four feet in height.
Manufactured homes and permanently installed travel trailers must be elevated to the FPE and tied down under the Illinois Mobile Home Tie-Down Act, 77 Ill. Adm. Code 870.
Violations & Fines
Building below the flood protection elevation without meeting Section 13-1-7's fill, elevation, or floodproofing standards is enforced the same way as an unpermitted development under Section 13-1-12: written notice from the County State's Attorney, ten days to fix it, then a circuit court injunction and a fine of $50 to $500 per offense, with each day counted separately and a notice of violation recorded on the property's title.
Frequently Asked Questions
What is St. Clair County's freeboard requirement?
Which projects have to meet the freeboard standard?
Can I finish a basement below the flood protection elevation?
Do manufactured homes have to meet the freeboard rule too?
Sources & Official References
Other rules in St. Clair County
Compare St. Clair County to another location·View the Illinois environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.