Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Freeboard requirement
1 foot above base flood elevation
Applies to
primary buildings in Zone A, A1-A99
Certification required from
registered engineer, architect or land surveyor
Maximum penalty
$500.00 fine or 6 months jail, per violation

Summary

Ascension Parish requires new buildings in the highest-risk flood zones to sit a full foot above the base flood elevation, not just even with it. Ascension Parish Code § 9.5-33(f) sets that one-foot freeboard for every primary building in FEMA Flood Zone A and Zones A1 through A99 in unincorporated Ascension Parish, on top of the parish's general elevation and floodproofing standards.

These county ordinances apply to unincorporated areas of Ascension Parish. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

Minimum elevation for development. All primary buildings located on land which is designated as FEMA Flood Zone A, A1-A99 shall be constructed with a minimum elevation of one (1) foot above the base flood elevation.

Full Breakdown

5-33 sets standards for subdivision proposals in special flood hazard areas, and subsection (f) adds a freeboard requirement above the base elevation rule found elsewhere in the chapter: all primary buildings located on land designated as FEMA Flood Zone A, A1-A99 shall be constructed with a minimum elevation of one foot above the base flood elevation. 5-23, which requires the applicant's registered professional engineer, architect or land surveyor to submit the lowest floor elevation, in relation to mean sea level, to the floodplain administrator as part of the development permit application.

5-7. Because the freeboard applies at the subdivision-standards level, it reaches new lots and manufactured home park development in addition to individual building permits, giving Ascension Parish an extra margin of protection beyond the base flood elevation shown on the parish's FEMA maps.

Violations & Fines

Constructing a primary building in Zone A, A1-A99 below the required one-foot freeboard violates section 9.5-33(f) and, like any other flood-chapter violation, is a misdemeanor under section 9.5-35: a fine of up to $500.00, imprisonment up to six months, or both, for each violation, plus case costs. The floodplain administrator can also refuse to approve the elevation certification required under section 9.5-23 until the freeboard is met.

Frequently Asked Questions

How far above the base flood elevation must I build in Ascension Parish?
At least one foot for any primary building in FEMA Flood Zone A or Zones A1-A99, under § 9.5-33(f). That one-foot margin is on top of the base flood elevation shown on the parish's FEMA maps.
Who certifies my building meets the freeboard requirement?
A registered professional engineer, architect or land surveyor submits the lowest floor elevation to the parish's floodplain administrator as part of the development permit under § 9.5-23.
Does the freeboard rule apply to a single lot or only subdivisions?
It sits in the parish's subdivision standards at § 9.5-33, so it reaches new subdivision lots and manufactured home park development in Zone A and A1-A99, on top of the individual building elevation rules elsewhere in Chapter 9.5.

Sources & Official References

Other rules in Ascension Parish

All Ascension Parish rules

Compare Ascension Parish to another location·View the Louisiana environmental rules overview

Get notified when Flood Elevation Requirements in Ascension Parish, LA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.