Lee's Summit, MO Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Residential freeboard
lowest floor 2 ft above base flood elevation
Non-residential option
floodproof to 2 ft, engineer-certified, in lieu of elevation
Critical facilities
elevated above the 500-year flood level
Substantial improvement threshold
cumulative work over 50% of market value in 5 yrs
Flood vent sizing
1 sq in of opening per sq ft enclosed

Summary

In mapped special flood hazard areas with published base flood elevations, Lee's Summit requires new and substantially improved homes and commercial buildings to elevate the lowest floor, including the basement and all mechanical equipment, to two feet above the base flood elevation, a two-foot freeboard margin above FEMA's minimum.

a.Residential construction: New construction or substantial-improvement of any residential structures, including manufactured homes, shall have the lowest floor, including basement and all mechanical, electrical, and/or other utility equipment, elevated to two feet above the base flood elevation.b.Non-residential construction: New construction or substantial-improvement of any commercial, industrial, or other non-residential structures, including manufactured homes, shall have the lowest floor, including basement, elevated to two feet above the base flood elevation or, together with attendant utility and sanitary facilities, be floodproofed so that below the base flood elevation the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 55 | Unified Development Ordinance: Supplement 15).

Full Breakdown

Where base flood elevation data have been provided for a numbered or unnumbered A or AE zone, UDO Sec. 170(B)(1)(a) requires that new construction or substantial improvement of any residential structure, including a manufactured home, have the lowest floor, including basement and all mechanical, electrical, and other utility equipment, elevated to two feet above the base flood elevation. That two-foot freeboard is a foot higher than the National Flood Insurance Program's own one-foot floor, giving Lee's Summit an added buffer against wave action and mapping error.

Non-residential construction faces the identical two-foot elevation standard under Sec. 170(B)(1)(b), with an alternative: a commercial, industrial or other non-residential building may instead be floodproofed below that elevation, provided a registered professional engineer or architect certifies the structure is watertight and can resist hydrostatic and hydrodynamic loads, with certification filed with the Floodplain Administrator. Manufactured homes get their own version of the same two-foot rule in most cases (Sec. 170(C)), and fully enclosed areas below the elevated lowest floor used for parking, access or storage must have flood-vent openings totaling at least one square inch per square foot of enclosed area, with the bottom of every opening no higher than one foot above grade (Sec.

170(B)(1)(c)). Critical facilities such as hospitals, fire stations, police stations and schools are held to a higher standard still: they must be elevated above the 500-year flood level, engineer-certified as watertight below that level, and have access routes above the 500-year flood elevation (Sec. 170(A)(9)). A structure may be remodeled without meeting these elevation standards only if the cumulative value of work over five years stays under 50 percent of the structure's market value; beyond that threshold the whole structure must come up to the two-foot freeboard.

Violations & Fines

Building or substantially improving a structure below the required two-foot freeboard without an engineer-certified floodproofing alternative is a misdemeanor under Sec. 5.250, fined up to $500 per day plus costs, and the City can withhold or revoke the floodplain development permit and pursue civil injunctive relief to force compliance or removal of the noncompliant work.

Frequently Asked Questions

How high above flood level must a new house be built in Lee's Summit?
Two feet above the base flood elevation. UDO Sec. 5.170(B)(1)(a) requires the lowest floor of new or substantially improved residential structures, including basements and utility equipment, to sit at least two feet above the FEMA base flood elevation for the mapped zone.
Can a commercial building be floodproofed instead of elevated?
Yes. Sec. 5.170(B)(1)(b) lets non-residential construction be floodproofed below the two-foot freeboard elevation instead of physically raised, but only if a registered professional engineer or architect certifies the structure is watertight and can resist flood forces, with that certification filed with the Floodplain Administrator.
Does a remodel have to meet the freeboard rule?
Only past a threshold. Sec. 5.170(A)(8) allows a structure to be remodeled or enlarged without meeting current elevation requirements as long as the cumulative value of work done in the prior five years stays under 50 percent of the structure's current market value; beyond that, the whole structure must be brought up to the two-foot freeboard.

Sources & Official References

Other rules in Lee's Summit

All Lee's Summit rules

Compare Lee's Summit to another location·View the Missouri environmental rules overview

Get notified when Flood Elevation Requirements in Lee's Summit, MO changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.