Lee's Summit, MO Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Residential freeboard
- lowest floor 2 ft above base flood elevation
- Non-residential option
- floodproof to 2 ft, engineer-certified, in lieu of elevation
- Critical facilities
- elevated above the 500-year flood level
- Substantial improvement threshold
- cumulative work over 50% of market value in 5 yrs
- Flood vent sizing
- 1 sq in of opening per sq ft enclosed
Summary
In mapped special flood hazard areas with published base flood elevations, Lee's Summit requires new and substantially improved homes and commercial buildings to elevate the lowest floor, including the basement and all mechanical equipment, to two feet above the base flood elevation, a two-foot freeboard margin above FEMA's minimum.
a.Residential construction: New construction or substantial-improvement of any residential structures, including manufactured homes, shall have the lowest floor, including basement and all mechanical, electrical, and/or other utility equipment, elevated to two feet above the base flood elevation.b.Non-residential construction: New construction or substantial-improvement of any commercial, industrial, or other non-residential structures, including manufactured homes, shall have the lowest floor, including basement, elevated to two feet above the base flood elevation or, together with attendant utility and sanitary facilities, be floodproofed so that below the base flood elevation the structure is watertight with walls substantially impermeable to the passage of water and with structural components having the capability of resisting hydrostatic and hydrodynamic loads and effects of buoyancy.
Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 55 | Unified Development Ordinance: Supplement 15).
Full Breakdown
Where base flood elevation data have been provided for a numbered or unnumbered A or AE zone, UDO Sec. 170(B)(1)(a) requires that new construction or substantial improvement of any residential structure, including a manufactured home, have the lowest floor, including basement and all mechanical, electrical, and other utility equipment, elevated to two feet above the base flood elevation. That two-foot freeboard is a foot higher than the National Flood Insurance Program's own one-foot floor, giving Lee's Summit an added buffer against wave action and mapping error.
Non-residential construction faces the identical two-foot elevation standard under Sec. 170(B)(1)(b), with an alternative: a commercial, industrial or other non-residential building may instead be floodproofed below that elevation, provided a registered professional engineer or architect certifies the structure is watertight and can resist hydrostatic and hydrodynamic loads, with certification filed with the Floodplain Administrator. Manufactured homes get their own version of the same two-foot rule in most cases (Sec. 170(C)), and fully enclosed areas below the elevated lowest floor used for parking, access or storage must have flood-vent openings totaling at least one square inch per square foot of enclosed area, with the bottom of every opening no higher than one foot above grade (Sec.
170(B)(1)(c)). Critical facilities such as hospitals, fire stations, police stations and schools are held to a higher standard still: they must be elevated above the 500-year flood level, engineer-certified as watertight below that level, and have access routes above the 500-year flood elevation (Sec. 170(A)(9)). A structure may be remodeled without meeting these elevation standards only if the cumulative value of work over five years stays under 50 percent of the structure's market value; beyond that threshold the whole structure must come up to the two-foot freeboard.
Violations & Fines
Building or substantially improving a structure below the required two-foot freeboard without an engineer-certified floodproofing alternative is a misdemeanor under Sec. 5.250, fined up to $500 per day plus costs, and the City can withhold or revoke the floodplain development permit and pursue civil injunctive relief to force compliance or removal of the noncompliant work.
Frequently Asked Questions
How high above flood level must a new house be built in Lee's Summit?
Can a commercial building be floodproofed instead of elevated?
Does a remodel have to meet the freeboard rule?
Sources & Official References
Other rules in Lee's Summit
Compare Lee's Summit to another location·View the Missouri environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Elevation Requirements in Nearby Cities
How other cities in Jackson County handle flood elevation requirements.