Modesto, CA Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Elevation standard
Lowest floor at or above base flood elevation
Freeboard added
None; BFE is the floor, not BFE-plus
Certification required
Registered civil engineer or licensed surveyor
Basements
Prohibited outright in residential structures
Nonresidential option
Dry floodproofing below BFE with engineer certification
Accessory structure exception
One-story, 600 sq ft or less, below BFE allowed

Summary

New and substantially improved homes in a Modesto special flood hazard area must have the lowest floor elevated to or above the base flood elevation shown on the FEMA rate maps. The code sets that BFE line as the floor, with no added freeboard margin, and requires a registered engineer or surveyor to certify the finished elevation.

Residential Construction. All new construction or substantial improvements of residential structures shall have the lowest floor, including basement: (i) In AE, AH, A1-30 zones, elevated to or above the base flood elevation; (ii) In an A zone, without BFE's specified on the FIRM (unnumbered A zone), elevated to or above the base flood elevation, as determined under Section 9-4.402(c). Upon the completion of the structure, the elevation of the lowest floor, including basement, shall be certified by a registered civil engineer or licensed land surveyor, and verified by the community building inspector to be properly elevated.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 71).

Full Breakdown

201(h) defines base flood elevation, or BFE, as the water surface elevation shown on the Flood Insurance Rate Map for zones AE, AH, A1-30, VE and V1-V30 that results from a flood with a one percent or greater annual chance of occurring, commonly called the 100-year flood. 402(c). The code stops at that line: it does not add a freeboard buffer of extra feet above the BFE the way some jurisdictions do. Once construction is finished, a registered civil engineer or licensed land surveyor must certify the lowest-floor elevation, and a community building inspector must verify it before the Floodplain Administrator accepts it.

501(c)(2): they may be dry floodproofed below the BFE instead of elevated, but only with a registered engineer's or architect's certification that the structure is watertight and can resist hydrostatic and hydrodynamic loads. 201(ah)(2) prohibits all subgrade enclosed areas in residential structures, including below-grade garages and storage, because they count as basements regardless of use. 501(c)(5)(ii) lets a detached, one-story accessory structure of 600 square feet or less sit below the BFE if it is limited to parking or storage, built with flood-resistant materials, anchored against flotation, and designed to let floodwater automatically enter and exit.

Violations & Fines

A structure built below the required base flood elevation without the elevation certificate or other proof of compliance is presumed to be in violation under Section 9-4.201(bd) until that documentation is produced. Section 9-4.402(e) requires the Floodplain Administrator to obtain and keep on file the elevation certifications required by Sections 9-4.501(c)(1) and 9-4.504, and the City can take remedial action under Section 9-4.402(g) against noncompliant construction.

Frequently Asked Questions

How high above the flood line must a Modesto home be built?
The lowest floor, including any basement, must be elevated to or above the base flood elevation shown on the FEMA Flood Insurance Rate Map for the parcel's zone, per Section 9-4.501(c)(1). The code does not require any additional freeboard above that BFE line.
Can a basement be built below the base flood elevation?
No. Section 9-4.201(ah)(2) treats every subgrade enclosed area in a residential structure, including a below-grade garage or storage room, as a basement, and basements are prohibited in special flood hazard areas.
Who has to certify the finished elevation of a new house?
A registered civil engineer or licensed land surveyor must certify the lowest-floor elevation once construction is complete, and a City building inspector must verify it before the Floodplain Administrator will accept the documentation under Section 9-4.501(c)(1).
Can a nonresidential building be floodproofed instead of elevated?
Yes. Section 9-4.501(c)(2) allows a nonresidential structure to be dry floodproofed below the base flood elevation instead of physically elevated, but a registered engineer or architect must certify the structure is watertight and can resist flood loads.

Sources & Official References

Other rules in Modesto

All Modesto rules

California rules heatmap·Compare Modesto to another location·View the California environmental rules overview

Get notified when Flood Elevation Requirements in Modesto, CA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.