Key Facts

Freeboard required
1 foot above base flood elevation, residential and nonresidential
No BFE data available
Lowest floor at least 2 ft above highest adjacent grade
Nonresidential alternative
Flood-proofing with engineer/architect certification allowed
Manufactured homes
Same 1-foot elevation standard, securely anchored
Governing section
UDO § 12-2.4(D)

Summary

Where base flood elevation data exists, unincorporated Nash County requires new or substantially improved residential and nonresidential buildings in a special flood hazard area to have their lowest floor, including any basement, elevated at least one foot above base flood elevation. Manufactured homes in those areas face the same one-foot elevation requirement.

These county ordinances apply to unincorporated areas of Nash County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

12-2.4.Construction Within Areas of Special Flood Hazard Restricted. ... (D)In all areas of special flood hazard where base flood elevation data has been provided, the following specific standards shall apply to any permissible use and any use allowed by variance (in accordance with Section 7-2.2):(1)Residential Construction. New construction or substantial improvement of any residential structure shall have the lowest floor, including basement, elevated one foot above the base flood elevation. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to facilitate the unimpeded movements of floodwaters shall be provided.(2)Nonresidential Construction. New construction or substantial improvement of any commercial, industrial, or nonresidential structure shall have the lowest floor, including basement, elevated one foot above the level of the base flood elevation.

Full Breakdown

4 of the Unified Development Ordinance, within the Flood Hazard Overlay District rules, sets the elevation standard once base flood elevation data has been provided for an area of special flood hazard. Under (D)(1) Residential Construction, new construction or substantial improvement of a residential structure must have the lowest floor, including a basement, elevated one foot above the base flood elevation; if solid foundation perimeter walls are used instead of open piers, the walls must include openings sized to let floodwaters move through unimpeded. Under (D)(2) Nonresidential Construction, commercial, industrial or other nonresidential structures face the identical one-foot-above-BFE elevation standard for their lowest floor, though those structures in A-zones may instead be flood-proofed, with a registered engineer or architect certifying that the flood-proofed design is watertight and can resist hydrostatic and hydrodynamic loads.

Manufactured homes get the same one-foot freeboard requirement under (D)(3), whether placed in a new park, an expansion, or an existing park after a flood-related substantial improvement, and must be securely anchored to resist flotation, collapse and lateral movement. 4(E)(2) instead requires the lowest floor to sit at least two feet above the highest adjacent grade, a stricter fallback for areas without mapped BFE numbers.

Violations & Fines

Construction that does not meet the one-foot freeboard standard, or that lacks the engineer's certification required for flood-proofed nonresidential buildings, is enforced through a Notice of Violation from the Zoning Administrator, who holds the specific flood damage prevention duties under Section 12-2.7 (Sec. 5-3.1). Appeals in a flood overlay case go to the Board of Adjustment, with a hearing held within 10 days of the notice (Sec. 5-3.2). An uncorrected violation carries a $100-per-day civil penalty (Sec. 5-5.1, 5-5.4) and can be prosecuted as a misdemeanor under NCGS 14-4 (Sec. 5-4.6).

Frequently Asked Questions

How high above the flood elevation must I build in a Nash County flood zone?
One foot. UDO Section 12-2.4(D)(1) and (D)(2) require the lowest floor, including any basement, of new or substantially improved residential and nonresidential structures to be elevated at least one foot above the base flood elevation where BFE data has been provided.
Can a commercial building be flood-proofed instead of elevated?
Yes, if it's in an A-zone. Section 12-2.4(D)(2) allows nonresidential structures to be flood-proofed in lieu of elevation, provided a registered professional engineer or architect certifies the design is watertight and can resist hydrostatic and hydrodynamic loads.
What if there's no base flood elevation data for my property?
Section 12-2.4(E)(2) sets a fallback: when BFE data isn't available from a federal, state or other source, the lowest floor, including basement, must be elevated at least two feet above the highest adjacent grade instead of the standard one-foot freeboard.

Sources & Official References

Other rules in Nash County

All Nash County rules

Compare Nash County to another location·View the North Carolina environmental rules overview

Get notified when Flood Elevation Requirements in Nash County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.