Skip to main content
CityRuleLookup

New Bedford, MA Environmental Rules: Flood Elevation Requirements (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

BFE data trigger
Subdivisions/developments over 50 lots or 5 acres
Applies in
Unnumbered A zones (no FEMA-set BFE)
Floodway encroachment standard
Best available federal/state/local data
Zone A elevation basis
Building department's own data review
AO/AH zones
Require drainage paths around structures
Zoning violation fine
$300 per offense, per day

Summary

In New Bedford's unnumbered A flood zones, subdivisions or developments larger than 50 lots or 5 acres, whichever is less, must supply base flood elevation data. Along undesignated floodways, the best available federal, state or local data is used to bar any encroachment that would raise flood levels.

1. Floodway Data. In Zones A, and AE, along watercourses that have not had a regulatory floodway designated, the best available federal, state, local, or other floodway data shall be used to prohibit encroachments in floodways which would result in any increase in flood levels within the community during the occurrence of the base flood discharge. 2. Base Flood Elevation Data. Base flood elevation data is required for subdivision proposals or other developments greater than fifty (50) lots or five (5) acres, whichever is the lesser, within unnumbered A zones.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 19).

Full Breakdown

Section 4440 splits New Bedford's base flood elevation and floodway rules into two parts. First, for Floodway Data: in Zones A and AE along watercourses that have not had a regulatory floodway officially designated, the City requires that the best available federal, state, local, or other floodway data be used to prohibit any encroachment that would cause an increase in flood levels within the community during a base flood discharge event. This means the absence of a mapped regulatory floodway does not exempt a project from floodway analysis; the City still applies the best data on hand to block any project that would raise flood elevations for neighboring properties.

Second, for Base Flood Elevation Data specifically: the ordinance requires base flood elevation data for subdivision proposals or other developments greater than 50 lots or 5 acres, whichever is the lesser threshold, when the project sits within an unnumbered A zone, meaning an area FEMA has mapped as a 100-year floodplain without establishing a specific base flood elevation number. Section 4480 builds on this by directing the building department to obtain, review, and reasonably use base flood elevation and floodway data from federal, state, or other sources as the basis for requiring new construction, substantial improvements, or other development in Zone A to elevate residential structures to or above base flood level, to floodproof or elevate nonresidential structures, and to prohibit floodway encroachments, even where FEMA has not itself supplied a BFE number for the site.

Section 4481 separately requires adequate drainage paths around structures on sloped ground within Zones AO and AH, to guide floodwaters around and away from the structure rather than through it.

Violations & Fines

Developing a qualifying subdivision or large project in an unnumbered A zone without supplying base flood elevation data, or encroaching on a floodway in violation of the best-available-data standard, is a zoning violation. Section 5130 sets the penalty at $300 per offense, with each day of noncompliance a separate offense, enforced by the Inspector of Buildings as floodplain administrator.

Frequently Asked Questions

When does New Bedford require base flood elevation data for a project?
Section 4440 requires base flood elevation data for subdivision proposals or other developments larger than 50 lots or 5 acres, whichever is smaller, when the project is located within an unnumbered A zone, an area FEMA has mapped as flood-prone without assigning a specific base flood elevation figure.
What happens if FEMA hasn't set a base flood elevation for my property?
Section 4480 directs New Bedford's building department to obtain and reasonably use base flood elevation and floodway data from federal, state or other sources as the basis for elevating or floodproofing structures in Zone A, and for prohibiting floodway encroachments, even without a FEMA-assigned number.
Can I build in a floodway that New Bedford hasn't officially mapped?
Only if it won't raise flood levels. Section 4440 requires that in Zones A and AE without a designated regulatory floodway, the best available federal, state or local floodway data be used to prohibit any encroachment that would increase flood levels during a base flood discharge.

Sources & Official References

Other rules in New Bedford

All New Bedford rules

Compare New Bedford to another location·View the Massachusetts environmental rules overview

Get notified when Flood Elevation Requirements in New Bedford, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Flood Elevation Requirements in Nearby Cities

How other cities in Bristol County handle flood elevation requirements.

Taunton, MA
Significant Restrictions