Spokane Valley, WA Environmental Rules: Flood Elevation Requirements (2026)
Key Facts
- Residential freeboard
- 1 foot above base flood elevation
- Enclosed space below floor
- flood vents, 1 sq in per sq ft
- Nonresidential option
- flood-proof watertight to 1 ft above BFE
- No-data zones
- administrator may require 2 ft above grade
- Certification required
- Washington-licensed engineer or architect
Summary
New residential construction in a Spokane Valley flood hazard area must elevate its lowest floor, including any basement, at least one foot above the base flood elevation under SVMC § 21.30.090(C)(1)(a). Nonresidential buildings may instead be flood-proofed watertight to that same one-foot freeboard level under subsection (C)(2).
Specific Standards. In all areas of special flood hazards where base flood elevation data has been provided (Zones A1 – 30, AH, and AE) as set forth in SVMC § 21.30.020...the following provisions are required: 1. Residential Construction. a. New construction and substantial improvement of any residential structure shall have the lowest floor, including basement, elevated one foot or more above the base flood elevation.
Full Breakdown
070(D)(4). 090(C)(1)(a) requires the lowest floor, including any basement, to sit one foot or more above the base flood elevation, a foot of freeboard beyond FEMA's minimum. 090(C)(1)(b) requires either a professional engineer's or architect's certification, or, at minimum, two openings with a combined net area of at least one square inch per square foot of enclosed area, with the bottom of every opening no higher than one foot above grade. 090(C)(2): instead of elevating, they may be flood-proofed so that everything below one foot above base flood level is watertight, with walls substantially impermeable to water and structural components able to resist hydrostatic and hydrodynamic loads, certified by a Washington-licensed professional engineer or architect.
Applicants choosing flood-proofing must be told that flood insurance premiums will be rated as if the building sat one foot lower than its flood-proofed level. 090(B) still lets the floodplain administrator require the lowest floor be set at least two feet above the highest adjacent natural ground, warning that skipping that two-foot buffer can mean higher insurance rates.
Violations & Fines
Constructing below the required base flood elevation freeboard violates SVMC § 21.30.030's compliance mandate and is enforced through Chapter 17.100 SVMC. The floodplain administrator can issue a notice and order requiring correction, and civil penalties escalate from $500 for a first violation to $1,000, then $2,000 for repeat violations within three years, or $10,000 where the shortcut produced an economic benefit.
Frequently Asked Questions
How high above base flood elevation must a Spokane Valley home be built?
Can a commercial building in Spokane Valley be flood-proofed instead of elevated?
What if my enclosed area sits below the required elevated floor?
Sources & Official References
Other rules in Spokane Valley
Compare Spokane Valley to another location·View the Washington environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.