Skip to main content
CityRuleLookup

Springfield, MA Environmental Rules: Flood Elevation Requirements (2026)

Significant Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified August 2026

Key Facts

District
FEMA Zone A / AE areas
Permit required
Special Permit, Board of Appeals
FIRM date
June 7, 2023, Hampden County
Large subdivisions
BFE data needed over 50 lots/5 acres
Mobile homes
Prohibited in Floodplain District

Summary

Springfield, Massachusetts requires a Board of Appeals special permit for any construction in its Floodplain Overlay District, and applicants must document the mean sea level elevation of the lowest habitable floor and any flood-proofing before building in a FEMA-mapped Zone A or AE area of Hampden County.

B. The location, dimensions and mean sea level of the lowest habitable floor, including basement of existing and proposed BUILDINGs and STRUCTURE thereon, and the elevation to which the STRUCTURE has been flood-proofed.

View official code

Official source re-checked September 7, 2026: the cited page had not changed since it was quoted.

Full Breakdown

The Floodplain Overlay District covers FEMA Zone A and AE areas shown on the Hampden County Flood Insurance Rate Map dated June 7, 2023. Any new construction, addition, fence, shed, or grading in the district needs a special permit from the Board of Appeals, and the application must show the mean sea level elevation of the lowest habitable floor and any flood-proofing measures, plus two-foot contour intervals within 200 feet of the work. Subdivisions over 50 lots or 5 acres must submit technical data establishing base flood elevations for every developable parcel, and mobile homes and mobile home parks are barred outright from the district.

Violations & Fines

Building without the required special permit or elevation documentation is a zoning violation: a $100 fine for a first offense, $300 for each repeat offense, with every day of noncompliance counted as a separate offense (§ 11.1.21).

Frequently Asked Questions

Does Springfield require homes to be built above the base flood elevation?
Any floodplain construction needs a Board of Appeals special permit, and the application must document the lowest habitable floor's mean sea level elevation and any flood-proofing before the Building Commissioner approves it.
Can I build a shed or fence in Springfield's floodplain without a permit?
No. Section 8.4.41 requires a permit for fences, sheds, storage facilities, grading, and any other development in the Floodplain Overlay District, not just new buildings.

Sources & Official References

Other rules in Springfield

All Springfield rules

Compare Springfield to another location·View the Massachusetts environmental rules overview

Get notified when Flood Elevation Requirements in Springfield, MA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.