Key Facts

Freeboard required
1 foot above 100-year flood elevation
Who calculates it
licensed professional engineer or land surveyor
Governing section
Stafford County Code § 11-14
Related plan rule
§ 11-15 lot grading plan shows flood elevation

Summary

Stafford County will not issue a building permit unless the lowest floor sits at least one foot above the calculated 100-year flood elevation. A licensed engineer or land surveyor must first calculate the effect of a 100-year storm on the proposed building.

These county ordinances apply to unincorporated areas of Stafford County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(a)In building construction projects, erosion and sediment control devices shall be installed before footings may be approved. Erosion and sediment control devices shall be maintained in working order throughout construction.(b)No building permit for construction shall be issued until all roads and subdivision streets accessing the proposed building site have been graded and covered with base stone.(c)No building permit for construction shall be issued until the effect of a one-hundred-year storm on the proposed building has been calculated by a licensed professional engineer or land surveyor.(d)No building permit for construction shall be issued for a building with a proposed lowest floor less than one (1) foot above the one-hundred-year flood elevation as determined in subsection (c) above.

Full Breakdown

Section 11-14, Building construction projects, ties the building permit directly to flood-elevation math. Before a permit can be issued, the effect of a one-hundred-year storm on the proposed building has to be calculated by a professional engineer or land surveyor licensed in Virginia. That calculation then sets the flood elevation the building must clear: no permit issues for a structure with a proposed lowest floor less than one foot above the one-hundred-year flood elevation determined in that calculation. The same section requires erosion and sediment control devices to be installed before footings can be approved and kept in working order throughout construction, and it blocks a building permit until roads and subdivision streets serving the site have been graded and covered with base stone.

This freeboard requirement operates alongside the county's Flood Hazard Overlay District under the Zoning Ordinance and the residential lot grading plan requirements of Section 11-15, which require the plan to depict the 100-year flood elevation and finished floor elevations for single-family homes disturbing between 2,500 square feet and one acre. Taken together, a builder in a flood-prone part of the county cannot get past the building permit stage without the engineering documentation showing the freeboard has been met.

Violations & Fines

Building without meeting the one-foot freeboard requirement means the county will not issue the building permit in the first place, stopping construction at the permitting stage. Violations of the erosion and sediment control device requirement in the same section are enforced through Stafford County Code § 11-13, which allows a stop-work order and civil penalties up to $32,500.00 per violation, with willful noncompliance a misdemeanor punishable by up to 12 months in jail.

Frequently Asked Questions

How high above flood level must a new home's floor sit in Stafford County?
At least one foot above the 100-year flood elevation. Section 11-14(d) bars a building permit for any building with a proposed lowest floor less than one foot above the 100-year flood elevation calculated under subsection (c).
Who calculates the 100-year flood elevation for a Stafford County permit?
A licensed professional engineer or land surveyor. Section 11-14(c) requires the effect of a one-hundred-year storm on the proposed building to be calculated by such a professional before a building permit for construction can be issued.
Can I get a building permit before roads to my site are finished?
No. Section 11-14(b) blocks issuance of a building permit until all roads and subdivision streets accessing the proposed building site have been graded and covered with base stone.

Sources & Official References

Other rules in Stafford County

All Stafford County rules

Compare Stafford County to another location·View the Virginia environmental rules overview

Get notified when Flood Elevation Requirements in Stafford County, VA changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.