FEMA flood zone rules in Bristol Township, PA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit required
- Any construction or development anywhere in the Township
- Administrator
- Director of Building, Planning and Development
- Flood maps
- FEMA FIS and FIRMs dated March 16, 2015, or latest revision
- Fine range
- $25 to $600 plus costs of prosecution
- Watercourse setback
- 50 feet landward from top-of-bank in AE areas without floodway
- Permit timing
- Start within 180 days, finish within 12 months
- Appeal
- To the Zoning Hearing Board within 30 days
Summary
In Bristol Township, Bucks County, PA, Chapter 68 of the Township Code makes it unlawful to undertake any construction or development anywhere in the Township without a permit from the Floodplain Administrator. Floodway development is barred unless engineering shows no increase in flood levels, and violations are summary offenses with fines of $25 to $600.
A. It shall be unlawful for any person, partnership, business or corporation to undertake, or cause to be undertaken, any construction or development anywhere within the Township of Bristol unless a permit has been obtained from the Floodplain Administrator. ... (1) Within any floodway area, no encroachments, including fill, new construction, substantial improvements, or other development shall be permitted unless it has been demonstrated through hydrologic and hydraulic analysis, or other acceptable means, performed in accordance with standard engineering practice that the proposed encroachment would not result in any increase in flood levels within the community during the occurrence of the base flood discharge. ... (b) No new construction or development shall be located within the area measured 50 feet landward from the top-of-bank of any watercourse, unless written consent is obtained from the Department of Environmental Protection regional office.
Full Breakdown
Chapter 68 of the Bristol Township Code, adopted by Township Council on 2-19-2015 by Ord. No. 2015-02, applies to the whole Township. Section 68-3 requires a permit from the Floodplain Administrator before any construction or development, and minor repairs to existing buildings or structures need no permit. The Director of Building, Planning and Development holds that role under § 68-7, and the Township Manager fills in if the post is vacant.
The identified floodplain area under § 68-18 is the special flood hazard area in the FEMA flood insurance study and FIRMs dated March 16, 2015, or the most recent revision, plus community identified flood hazard areas. Section 68-19 sorts it into the floodway, AE areas with and without a floodway, A areas, AO and AH areas, and community identified areas. In the floodway, no encroachment, including fill, new construction or substantial improvement, is permitted unless hydrologic and hydraulic analysis shows no increase in flood levels during the base flood discharge. In an AE area without a floodway, no permit is granted if cumulative development would raise the base flood elevation more than one foot at any point, and new construction stays 50 feet landward from top-of-bank of any watercourse unless the Department of Environmental Protection regional office consents in writing.
Applicants file in writing on Township forms with owner, contractor, site, a description of work and cost, and a site plan. Projects in an identified floodplain area also go to the Bucks County Conservation District for review and comment before a permit issues. Work must start within 180 days of issuance and finish within 12 months unless the Floodplain Administrator extends the permit in writing. A placard showing the permit number stays posted during construction. Anyone aggrieved by an administrator decision has 30 days to appeal in writing to the Zoning Hearing Board.
Violations & Fines
Under § 68-16, anyone who fails to comply with Chapter 68 or with a notice or order of the Floodplain Administrator is guilty of a summary offense and pays a fine to Bristol Township of not less than $25 nor more than $600 plus costs of prosecution. Written notices allow a reasonable time not to exceed 30 days for compliance. Township Council can declare noncompliant development a public nuisance, and an action in equity remains available.
Frequently Asked Questions
Do I need a permit to build in Bristol Township if my lot is not in a flood zone?
Who administers the floodplain rules in Bristol Township?
Can I build in the floodway?
How do I appeal a Floodplain Administrator decision?
Sources & Official References
Other rules in Bristol Township
Compare Bristol Township to another location·View the Pennsylvania environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.