Edmonds, WA Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Edmonds, WA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit trigger
- Any construction/development in special flood hazard area
- Covers
- All structures, including manufactured homes
- FIS/FIRM basis
- Snohomish County study dated 6/19/2020
- Administrator
- Building official (floodplain administrator)
- Habitat assessment
- Required unless activity is exempt
- Records on file
- 121 5th Avenue North, Edmonds
Summary
Any construction or development within an Edmonds special flood hazard area needs a floodplain development permit before work begins, covering all structures, including manufactured homes, and all development activity such as fill, grading or paving, administered by the building official as floodplain administrator.
A. Lands to Which This Chapter Applies. This chapter shall apply to all special flood hazard areas within the boundaries of the city of Edmonds. ... ... A. Establishment of a Development Permit. 1. Development Permit Required. A development permit shall be obtained before construction or development begins within any area of special flood hazard established in ECDC 19.07.010. The permit shall be for all structures including manufactured homes, as set forth in ECDC 19.07.020, Definitions, and for all development including fill and other activities, also as set forth in ECDC 19.07.020, Definitions.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 4444, passed August 3, 2026).
Full Breakdown
07 to every special flood hazard area within Edmonds city limits, based on the Flood Insurance Study for Snohomish County dated June 19, 2020 and its accompanying Flood Insurance Rate Maps, both on file at the planning and development department at 121 5th Avenue North. 020 defines broadly to include buildings, mining, dredging, filling, grading, paving, excavation, drilling operations, and storage of equipment or materials. Applications must include site plans, an elevation certificate showing the lowest floor's elevation relative to mean sea level, floodproofing certification by a registered engineer or architect for nonresidential buildings, a description of any watercourse alteration, and a V-zone design certificate where applicable.
The building official, acting as floodplain administrator, reviews each permit to confirm chapter requirements are met, other state and federal permits are secured, and the site is reasonably safe from flooding, and must notify FEMA when annexations bring new territory into the special flood hazard area. 050 requires a habitat assessment with most development permit applications unless the work fits a listed exemption, such as normal maintenance under 50 percent of structure value, footprint expansions of 10 percent or less, or open space development that removes no more than five percent of native vegetation.
Violations & Fines
Chapter 19.07 does not carry its own separate penalty; floodplain development performed without the required permit is enforced as a building code violation under ECDC 19.85.000, a misdemeanor with each day of noncompliance treated as a separate offense punishable under ECC 5.50.020.
Frequently Asked Questions
Where does Edmonds require a floodplain development permit?
What counts as "development" needing a floodplain permit in Edmonds?
Does every project in the Edmonds floodplain need a habitat assessment?
Sources & Official References
Other rules in Edmonds
Compare Edmonds to another location·View the Washington environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.