El Paso, TX Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in El Paso, TX, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Governing chapter
- El Paso City Code Ch. 18.60
- Maps used
- FEMA FIRM / FIS for El Paso
- Administrator
- TX-licensed engineer (§ 18.60.140)
- Permit required
- Before any floodplain development
- Adopted
- Ord. No. 019528, 8-1-2023
- Floodway rule
- No fill/construction without no-rise study
Summary
Any structure or land use inside an El Paso special flood hazard area needs a floodplain development permit before work starts. Chapter 18.60 applies FEMA's Flood Insurance Study maps citywide, and § 18.60.100 bars locating, altering, or changing the use of anything in the floodplain without a permit.
This chapter shall apply to all areas of special flood hazard within the jurisdiction of the city. ... Development permits shall be used to ensure conformance with the provisions of this chapter. ... No structure or land shall hereafter be located, altered, or have its use changed without full compliance with the terms of this chapter and other applicable regulations.
Full Breakdown
El Paso enacted its current Flood Damage Prevention chapter, Chapter 18.60, through Ord. No. 019528, § 1, on August 1, 2023, replacing the prior flood ordinance. Section 18.60.070 sets the geographic reach: 'This chapter shall apply to all areas of special flood hazard within the jurisdiction of the city.' Those areas are defined by reference in § 18.60.080 to FEMA's 'Flood Insurance Study for the City of El Paso,' with its accompanying Flood Insurance Rate Maps and Flood Boundary-Floodway Maps, 'utilizing the most current effective documents and any revisions thereto.' Section 18.60.090 creates the enforcement mechanism: 'Development permits shall be used to ensure conformance with the provisions of this chapter,' and § 18.60.100 makes that mandatory -- 'No structure or land shall hereafter be located, altered, or have its use changed without full compliance with the terms of this chapter and other applicable regulations.' A Texas-licensed professional engineer serves as floodplain administrator under § 18.60.140, reviewing every permit application against nine factors listed in § 18.60.180(B), from flood and erosion danger to the compatibility of the proposed use with the comprehensive plan.
Where the floodplain administrator denies a permit, § 18.60.180(C) lets the appeals officer hear a variance request, though variances are barred outright inside a designated floodway if they would raise flood levels at all, per § 18.60.180(C)(8). Section 18.60.230 separately forbids fill, new construction, or substantial improvements within an adopted regulatory floodway unless engineering analysis shows no increase in flood levels during the base flood.
Violations & Fines
Developing without a floodplain permit, or outside its terms, is unlawful under § 18.60.240(A) and punished as a misdemeanor under §§ 1.08.010 through 1.08.030 of the City Code. The floodplain administrator can also deny certificates of occupancy and require corrective work before a project is allowed to proceed.
Frequently Asked Questions
Do I need a permit to build in an El Paso flood zone?
What maps does El Paso use to define the flood hazard area?
Can I build inside the regulatory floodway?
Sources & Official References
Other rules in El Paso
Texas rules heatmap·Compare El Paso to another location·View the Texas environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.