FEMA flood zone rules in Lincoln County, NC, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Permitting authority
Floodplain Administrator
Governing law
Lincoln County Code § 151.22
FIRM date, unincorporated area
12-1-1981
Elevation cert deadline
7 days after reference level set
Enforcement
UDO § 11.2 penalties + civil abatement

Summary

In unincorporated Lincoln County, no development can begin inside a Special Flood Hazard Area shown on the county's FEMA flood maps without a floodplain development permit from the Floodplain Administrator. The permit process demands a scaled plot plan, flood zone and BFE data, and elevation certifications before, during, and after construction.

These county ordinances apply to unincorporated areas of Lincoln County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

§ 151.22 ESTABLISHMENT OF FLOODPLAIN DEVELOPMENT PERMIT. A floodplain development permit shall be required in conformance with the provisions of this chapter prior to the commencement of any development activities within Special Flood Hazard Areas determined in accordance with the provisions of § 151.21. ... No structure or land shall hereafter be located, extended, converted, altered, or developed in any way without full compliance with the terms of this chapter and other applicable regulations. Any person found to be in violation of this subchapter shall be subject to the penalties as provided in UDO § 11.2.

Full Breakdown

21 from the county's Flood Insurance Study and Flood Insurance Rate Maps dated 8-16-2007, with an original mapping date of 12-1-1981 for the unincorporated area. 41, an applicant must present a certified plot plan showing the boundary of the Special Flood Hazard Area, the applicable flood zone designation, floodway or non-encroachment boundaries, and available Base Flood Elevation data, plus the proposed elevation of every structure's reference level and utility systems. Certification requirements run through construction: an elevation certificate (FEMA Form 81-31) is due before construction starts, a second certificate is due within seven calendar days of the reference level being set, and a final as-built certificate is due before a certificate of compliance or occupancy issues.

Nonresidential floodproofing instead of elevation requires a floodproofing certificate (FEMA Form 81-65) with an operational and maintenance plan, certified by a licensed engineer or architect. 23 requires full compliance with the chapter for any structure or land located, extended, converted, altered, or developed in the mapped area, and the Floodplain Administrator can deny a permit or withhold occupancy for missing or deficient certifications.

Violations & Fines

Any person violating this chapter is subject to the penalties set out in UDO § 11.2 and is also subject to civil action for abatement or injunctive relief (Lincoln County Code §§ 151.23, 151.99). Failure to submit a required elevation or floodproofing certificate, or to correct deficiencies the Floodplain Administrator identifies, is grounds to deny the floodplain development permit outright or to issue a stop-work order once construction has begun.

Frequently Asked Questions

Do I need a permit to build in a Lincoln County flood zone?
Yes. Lincoln County Code § 151.22 requires a floodplain development permit from the Floodplain Administrator before any development activity begins within a Special Flood Hazard Area shown on the county's FEMA flood maps, regardless of the size of the project.
What has to be in my floodplain permit application?
Section 151.41 requires a scaled, certified plot plan showing the flood zone, floodway boundaries and Base Flood Elevation, proposed elevations of the structure and utilities, and, where applicable, a foundation plan and floodproofing certificate before the permit can be issued.
What happens if I don't submit my elevation certificate on time?
Under § 151.41(C), missing the seven-day deadline after the reference level is set is cause for the Floodplain Administrator to issue a stop-work order, and failing to submit the final as-built certificate withholds your certificate of compliance or occupancy.

Sources & Official References

Other rules in Lincoln County

All Lincoln County rules

Compare Lincoln County to another location·View the North Carolina environmental rules overview

Get notified when Flood Zones in Lincoln County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.