Monterey, CA Environmental Rules: Flood Zones (2026)
FEMA flood zone rules in Monterey, CA, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.
Key Facts
- Permit required
- Development Permit before construction begins
- Floodplain Administrator
- Chief of Inspection Services/Building Official
- Governing study
- 1986 Flood Insurance Study & FIRM
- Impact limit
- No more than 1-foot rise in base flood level
- Penalty
- Misdemeanor under § 9-69.3
- Appeals
- Planning Commission
Summary
Any construction or development within a designated area of special flood hazard in Monterey needs a Development Permit before work begins, issued under Monterey City Code §§ 9-69 through 9-72. The Chief of Inspection Services/Building Official serves as Floodplain Administrator, reviewing plans against the city's 1986 Flood Insurance Study and FIRM.
9-69.1. Lands to Which This Ordinance Applies.This ordinance shall apply to all areas of special flood hazards within the jurisdiction of the City of Monterey. ... 9-70.1. Establishment of Development Permit.A Development Permit shall be obtained before construction or development begins within any area of special flood hazards established in Section 9-69.
Official source re-checked September 8, 2026: no newer edition of the code had been published (publisher’s edition: current through Ordinance 3721, passed July 7, 2026).
Full Breakdown
2). 1 requires a Development Permit, applied for on City forms and typically supported by a registered civil engineer's site plan showing elevations, existing and proposed structures, fill, drainage and utility locations relative to mean sea level. 2) and reviews every development permit to confirm the site is reasonably safe from flooding, that other required state and federal permits are in hand, and that the project will not raise the base flood water surface elevation by more than one foot. 1). Monterey has no designated regulatory floodway, per a note under the code's 'Floodway' definition.
Violations & Fines
Building, altering or developing land within a Monterey flood hazard area without the Development Permit required by § 9-70.1, or without meeting the ordinance's terms, is a misdemeanor under § 9-69.3. The Planning Commission, acting as the appeal body, can take lawful action to prevent or remedy a violation, and a structure lacking the required elevation certificate or other compliance evidence is presumed to be in violation.
Frequently Asked Questions
Do I need a permit to build in a Monterey flood zone?
Who administers Monterey's flood zone rules?
What happens if I build in a flood zone without a permit?
Sources & Official References
Other rules in Monterey
California rules heatmap·Compare Monterey to another location·View the California environmental rules overview
See something wrong?
Help us keep this page accurate. If you notice an error or outdated information, let us know.
Flood Zones in Nearby Cities
How other cities in Monterey County handle flood zones.