FEMA flood zone rules in West Haven, CT, also called floodplain regulations or special flood hazard area (SFHA) rules, determine flood insurance requirements and elevation standards for new construction.

Key Facts

Administering agency
Planning and Zoning Commission (§ 111-5)
Appeal body
Flood Hazard Appeal Board, meets at least quarterly
Appeal hearing deadline
15 working days from receipt
Decision deadline
45 working days after hearing
Elevation records
Lowest floor including basement, recorded by Director
Adopted
4-11-1983, Ord. No. 201

Summary

In the City of West Haven, Connecticut, Chapter 111 makes the Planning and Zoning Commission the flood management agency and requires a permit for regulated activity in a flood hazard area. The Director of Planning records lowest-floor elevations, and appeals go to the Flood Hazard Appeal Board.

The Planning and Zoning Commission shall be the administering agency for the City of West Haven's flood management program. As such, the Commission will be responsible for adopting and, through its staff, administering a set of flood hazard area regulations. The Commission will also be responsible for creating a procedure for obtaining a permit to carry on regulated activities in a flood hazard area. ... ... E. With the assistance of the City Engineer, verify and record the actual elevation, in relation to mean sea level, of the lowest floor, including the basement, of all new or substantially improved structures. ... ... G. In coastal high-hazard areas, obtain certification from a registered professional engineer that the structure is securely anchored to adequately anchored pilings or columns in order to withstand velocity waters and hurricane wave wash.

Full Breakdown

Chapter 111 of the West Haven Code was adopted by the City Council on 4-11-1983 as Ord. No. 201. Section 111-1 finds that flood areas of the City are subject to periodic inundation from shoreline hazard areas hit by tidal and storm flooding. Section 111-2 sets the purpose: restrict or prohibit uses dangerous due to water, erosion or flood heights and velocities, require flood-vulnerable uses to be protected at the time of initial construction, control alteration of natural floodplains, stream channels and protective barriers, control filling, grading, dredging and other development that increases erosion or flood damage, and prevent or regulate flood barriers that divert floodwaters.

Under § 111-5 the Planning and Zoning Commission adopts and administers flood hazard area regulations and creates the permit procedure. The detailed elevation standards are in those regulations, not in the ordinance. The Director of Planning has duties under § 111-6: review development permits, confirm outside agency permits, notify adjacent communities and the State of Connecticut Department of Environmental Protection before a watercourse is altered or relocated, and submit evidence of that notice to the Federal Emergency Management Agency. With the City Engineer, the Director verifies and records the elevation of the lowest floor, including the basement, of all new or substantially improved structures, and the elevation to which they are floodproofed. In coastal high-hazard areas, a registered professional engineer must certify anchoring to pilings or columns, and the Director and the Building Official review breakaway walls.

Section 111-7 keeps records in the Planning and Zoning office open for public inspection. Section 111-8 designates the Flood and Erosion Control Board as the Flood Hazard Appeal Board, meeting at least quarterly. Section 111-9 requires a hearing within 15 working days of receiving an appeal and a written decision within 45 working days of the hearing's completion, sent by registered mail, with one extension of up to 45 working days if the applicant agrees.

Violations & Fines

Chapter 111 prints no fine or penalty clause of its own; enforcement runs through the flood hazard area regulations and permit procedure the Planning and Zoning Commission adopts under § 111-5. An applicant or property owner who disagrees with the regulations or a decision of the Director of Planning appeals to the Flood Hazard Appeal Board under §§ 111-8 and 111-9.

Frequently Asked Questions

Who administers flood zone rules in the City of West Haven?
Section 111-5 makes the Planning and Zoning Commission the administering agency for the City of West Haven's flood management program. It adopts flood hazard area regulations and creates the permit procedure for regulated activity in a flood hazard area, and its staff administers them.
What does the Director of Planning record for new buildings in West Haven?
Under § 111-6, with the City Engineer's help, the Director verifies and records the actual elevation, in relation to mean sea level, of the lowest floor, including the basement, of all new or substantially improved structures, and the elevation to which they are floodproofed.
What extra step applies in coastal high-hazard areas?
Section 111-6 requires a registered professional engineer's certification that the structure is securely anchored to adequately anchored pilings or columns to withstand velocity waters and hurricane wave wash. The Director and the Building Official also review plans for the adequacy of breakaway walls.
How does a West Haven owner appeal a flood decision?
Appeals go to the Flood Hazard Appeal Board, which is the Flood and Erosion Control Board under § 111-8. Section 111-9 requires a hearing within 15 working days of receipt and a written decision within 45 working days after the hearing, sent by registered mail.

Sources & Official References

Other rules in West Haven

All West Haven rules

Compare West Haven to another location·View the Connecticut environmental rules overview

Get notified when Flood Zones in West Haven, CT changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.