Bexar County, TX Environmental Rules: Stormwater Management (2026)

Light Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

MS4 Permit
TXR040000
Construction Permit
TXR150000
Disturbance Trigger
1 acre or more
Edwards WPAP
Required 5+ acre recharge sites
BMP Capture
First 1.5 inches runoff

Summary

Bexar County stormwater is regulated under TCEQ MS4 permit TXR040000. Construction sites of 1 acre or more need an SWPPP and NOI. Edwards Aquifer Recharge Zone sites face extra TCEQ WPAP requirements.

City-specific rules exist: Universal City, Converse, and San Antonio have their own stormwater management rules that differ from Bexar County's county-level regulations. If you live in one of those cities, check the city-specific page instead.

Stormwater General Permit for Construction Activities Stormwater permit requirements for the discharge of stormwater associated with construction activities that disturb one (1) or more acres of soil. [...] 2023 CGP TXR150000 TCEQ issued the renewal of the CGP with an effective date of March 5, 2023. Construction activities are regulated under the CGP if they discharge stormwater to any surface water in the state and disturb an acre or more of soil. [...] Stormwater Requirements for Construction Activities Large construction activities which disturb 5 or more acres, or are part of a larger common plan of development or sale that will disturb 5 or more acres, are regulated under this general permit. Small construction activities which disturb at least 1 but less than 5 acres, or are part of a larger common plan of development or sale that will disturb at least 1 but less than 5 acres, are also regulated under this general permit. Construction activities that disturb less than 1 acre, and are not part of a larger common plan of development or sale that would disturb 1 or more acres, are not regulated by this general permit. Stormwater Pollution Prevention Plan (SWP3) The CGP requires construction site operators to develop and implement a Stormwater Pollution Prevention Plan (SWP3) prior to commencing construction. A SWP3 is a document that outlines construction plans and best management practices (BMPs) to control pollutants that may be discharged in stormwater runoff.

Source: TCEQ Construction General Permit TXR150000View official code

Full Breakdown

Bexar County is covered by the Texas Commission on Environmental Quality (TCEQ) Municipal Separate Storm Sewer System (MS4) general permit, TXR040000, which imposes six minimum control measures on local jurisdictions including public education, illicit discharge detection, construction site runoff control, and post-construction stormwater management. For individual construction sites, Texas Pollutant Discharge Elimination System (TPDES) Construction General Permit TXR150000 requires any operator disturbing one acre or more, or less than one acre if part of a larger common plan of development, to prepare a Stormwater Pollution Prevention Plan (SWPPP), file a Notice of Intent with TCEQ, and install and maintain best management practices including silt fence, inlet protection, and stabilized construction exits.

In addition, any development over the Edwards Aquifer Recharge Zone or Transition Zone, which covers a large arc across northern Bexar County including parts of San Antonio, Castle Hills, and unincorporated areas, is subject to the TCEQ Edwards Aquifer Protection Program. Recharge zone developments disturbing 5 acres or more require a Water Pollution Abatement Plan (WPAP) approved by TCEQ before construction; smaller sites need a Contributing Zone Plan. 5 inches of runoff.

Violations & Fines

TCEQ enforcement penalties for stormwater violations range from 1,000 to more than 25,000 dollars per day depending on severity. Clean Water Act citizen suit liability can add federal exposure. Edwards Aquifer WPAP violations have triggered six-figure settlements in the San Antonio region.

Frequently Asked Questions

When do I need a stormwater permit in Bexar County?
Any construction disturbing one acre or more, or smaller if part of a larger common plan, requires a TPDES Construction General Permit with an SWPPP filed with TCEQ.
What if my site is on the Edwards Aquifer Recharge Zone?
You need TCEQ approval of a Water Pollution Abatement Plan before construction if disturbing 5 acres or more, or a Contributing Zone Plan for smaller sites, plus permanent water quality BMPs sized for the first 1.5 inches of runoff.

Sources & Official References

Other rules in Bexar County

All Bexar County rules

Texas rules heatmap·Compare Bexar County to another location·View the Texas environmental rules overview

Get notified when Stormwater Management in Bexar County, TX changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.

Stormwater Management in Cities Across Bexar County