Key Facts

Governing section
Subdivision Regs § 4-6.6
Design storm standard
10-year storm drainage data minimum
Sanitary sewer rule
No surface water into sanitary sewers
As-built drawings due
Within 30 days of completion
Enforcing agency
Planning and Development Department

Summary

New subdivisions in unincorporated Carteret County must install an adequate surface water drainage system built to the Sedimentation Pollution Control Act, North Carolina stormwater runoff rules, and NCDOT standards. Section 4-6.6 of the county's Subdivision Regulations requires the design to handle a ten-year storm and forbids piping surface water into any sanitary sewer line.

These county ordinances apply to unincorporated areas of Carteret County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

(A)An adequate surface water drainage system, including necessary open ditches, pipes, culverts, intersectional drains, drop inlets, bridges, etc., shall be provided for the proper drainage of all surface water. The surface water drainage system plan shall be designed in accordance with the Sedimentation Pollution Control Act, the North Carolina Stormwater Run-off Regulations, ... and the specifications and standards of the NCDOT. (B)The storm drainage system shall follow existing topography as nearly as practical, shall divert stormwater away from surface waters, and shall incorporate stormwater best management practices to minimize adverse water quality impacts. ... (C)No surface water shall be channeled into a sanitary sewer. (D)Where feasible, the subdivider shall connect the new subdivision's storm drainage system to an existing storm drainage system. ... Ten-year storm drainage data shall be used as a minimum standard for storm drainage system design.

Full Breakdown

Section 4-6.6 of the Carteret County Subdivision Regulations requires every proposed subdivision to provide an adequate surface water drainage system, including open ditches, pipes, culverts, intersectional drains, drop inlets, and bridges as needed to properly drain the tract. The Planning and Development Department reviews the plan against the Sedimentation Pollution Control Act, the North Carolina Stormwater Run-off Regulations, the Handbook for the Design of Highway Surface Drainage Structures, and NCDOT specifications before any utility construction plans are approved. The drainage system must follow existing topography as closely as practical, divert stormwater away from surface waters, and incorporate stormwater best management practices to limit water-quality impacts; ditch banks must be seeded immediately after grading and utility installation and kept in vegetative cover to control erosion.

No surface water may be channeled into a sanitary sewer under any circumstance. Where an existing storm drainage system serves the area, the developer must connect to it if feasible; otherwise a new system must be designed to protect the development from water damage, using ten-year storm drainage data as the minimum design standard. The county also requires drainage easements under Section 4-6.5(C) wherever a subdivision is crossed by a water course, drainageway, channel or stream. As-built drawings of the completed drainage system are due to the county within 30 days of completion under Section 4-6.3(C), and final plat approval is withheld until the county receives them.

Violations & Fines

There is no separate fine schedule for stormwater noncompliance; the county enforces Section 4-6.6 through the plat and permitting process. The Planning and Development Department will not approve utility construction plans or issue final plat approval until the drainage design meets the section's standards, and final plat approval is withheld until as-built drainage drawings are submitted under Section 4-6.3(C).

Frequently Asked Questions

Does unincorporated Carteret County require a stormwater plan for new subdivisions?
Yes. Section 4-6.6 of the Subdivision Regulations requires every proposed subdivision to include a surface water drainage system designed to the Sedimentation Pollution Control Act, state stormwater runoff rules, and NCDOT specifications, reviewed by the Planning and Development Department before utility construction plans are approved.
What design storm must a Carteret County subdivision drainage system handle?
The system must be designed using ten-year storm drainage data as the minimum standard under Section 4-6.6(D). Where an existing storm drainage system can feasibly serve the new subdivision, the developer must connect to it rather than building a separate system.
Can stormwater be piped into the sanitary sewer in Carteret County?
No. Section 4-6.6(C) states flatly that no surface water shall be channeled into a sanitary sewer, and the county's Planning and Development Department checks drainage plans for this requirement before approving any utility construction plans for a subdivision.

Sources & Official References

Other rules in Carteret County

All Carteret County rules

Compare Carteret County to another location·View the North Carolina environmental rules overview

Get notified when Stormwater Management in Carteret County, NC changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.