Chattanooga, TN Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

SOV target
first 1 inch, 100% managed
Trigger
1+ acre disturbance
TSS alternative
filter to 80% removal
Owner duty
inspect SCMs quarterly
Full inspection
every 5 years

Summary

New development and redevelopment in Chattanooga must manage the first inch of every rainstorm on-site with no discharge to surface waters, under the City's stormwater ordinance.

For projects greater than one (1) acre of disturbance or part of a larger plan of common development that will exceed one (1) acre of disturbance, all new developments and all redevelopment projects, in combination or alone, are required to incorporate runoff reduction measures designed, constructed and maintained, to manage (infiltrate, evapotranspire, harvest and/or use), at a minimum, the first one (1.0) inch of every rainfall event preceded by seventy-two (72) hours of no measurable precipitation, with no discharge from the project site to surface waters.

View official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 40 Update 1).

Full Breakdown

Sec. 31-313 sets Chattanooga's core stormwater standard: projects disturbing an acre or more must install runoff-reduction measures, infiltration, evapotranspiration, harvesting, or reuse, sized to fully manage the first inch of every rainfall event after 72 dry hours, with zero discharge to surface waters. Where that Stay-on-Volume target is infeasible, developers can instead pay a mitigation fee or filter a 2.1-inch or 3.1-inch storm to strip at least 80% of total suspended solids. Facilities must also attenuate peak runoff for the 2-, 5-, 10-, and 25-year 24-hour storms, and owners are responsible for inspecting and maintaining their own stormwater control measures afterward.

Violations & Fines

Skipping required stormwater controls or letting facilities fail violates Secs. 31-313 and 31-314; the City's general penalty (Sec. 1-8) reaches $500 per day, and the City can order corrective maintenance at the owner's expense.

Frequently Asked Questions

What is Chattanooga's 'Stay on Volume' stormwater requirement?
Projects over an acre must manage the first inch of every rainstorm on-site, through infiltration, evapotranspiration, harvesting or reuse, with no discharge to surface waters, per Sec. 31-313.
Who maintains a private stormwater pond in Chattanooga?
The property owner, at their own cost: quarterly inspections plus a full engineer inspection every five years, reported to the Water Quality Manager under Sec. 31-314.

Sources & Official References

Other rules in Chattanooga

All Chattanooga rules

Compare Chattanooga to another location·View the Tennessee environmental rules overview

Get notified when Stormwater Management in Chattanooga, TN changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.