Unincorporated San Mateo County is a permittee under the San Francisco Bay Area Municipal Regional Stormwater Permit (MRP 3.0, Order R2-2022-0018) which imposes NPDES Phase I stormwater requirements. Projects creating/replacing 2,500+ sq ft of impervious surface trigger C.3 post-construction stormwater treatment requirements (LID, biofiltration). Illicit discharges to storm drains are prohibited. Construction sites disturbing 1+ acres require SWPPPs and monthly wet-season inspections.
The County operates under the San Francisco Bay Regional Water Quality Control Board's MRP (Municipal Regional Stormwater NPDES Permit), which regulates municipal discharges from the County's MS4 (municipal separate storm sewer system). Provision C.3 (New Development and Redevelopment) applies to 'Regulated Projects' creating/replacing 2,500 sq ft or more of impervious surface β these projects must implement Low-Impact Development (LID) site design, source control, and stormwater treatment. Treatment options include bioretention (rain gardens), flow-through planters, pervious pavement, and infiltration trenches. Provision C.6 (Construction Site Controls) requires Erosion & Sediment Control Plans and monthly wet-season (Oct 1-Apr 30) inspections of construction sites 1+ acre. Illicit discharges of pollutants (paint, oil, soap, chemicals, gray water, pool chlorine) to storm drains are prohibited under Provision C.5 and County Code. Residents and contractors can report illicit discharges to the County stormwater hotline. All new development in unincorporated County must follow the SMC Green Infrastructure Plan's LID approach.
Illicit discharge to storm drain: Clean Water Act civil penalties up to $56,460/day plus County Code $500-$10,000 per incident. C.3 non-compliance: permit denial, required retrofit, $1,000-$25,000. SWPPP violation: stop-work order plus daily $250-$2,500. Sediment entering waterway: RWQCB enforcement up to $25,000/day.
Daly City, CA
Daly City prohibits nuisance barking under Title 6 (Animals) and Chapter 9.22 (Disturbing the Peace). Owners must prevent dogs from habitually barking or how...
Daly City, CA
Construction with a valid city permit is allowed weekdays 8 AM to 8 PM in Daly City. Weekend and holiday construction hours are more restricted. Unpermitted ...
Daly City, CA
Daly City regulates noise under Chapter 9.22 (Disturbing the Peace). Residential sound limits are 60 dBA daytime and 50 dBA nighttime. The general quiet peri...
Daly City, CA
Daly City restricts overnight and extended parking of large commercial vehicles in residential zones. California Vehicle Code provisions on commercial vehicl...
Daly City, CA
Daly City prohibits parking RVs, boats, trailers, and camper shells in the front yard of residential lots. They may only be parked on the driveway within app...
Daly City, CA
Daly City enforces California Vehicle Code Β§22651 for abandoned vehicles (72 hours on public street). Street sweeping parking restrictions are posted by bloc...
Side-by-side rule comparisons with other cities in San Mateo County.
See how Daly City's stormwater management rules stack up against other locations.
Help us keep this page accurate. If you notice an error or outdated information, let us know.