Skip to main content
CityRuleLookup

Little Rock, AR Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Permit trigger
1,000+ cubic yards cut/fill
Hillside trigger
over 10 vertical feet
Floodplain land
permit required, no exceptions
Review time
10 working days
Max fine
$1,000, or $500/day continuing

Summary

Little Rock requires a city grading permit before major land disturbance, with drainage and erosion controls mandatory citywide and no exceptions in the floodplain.

All construction work shall include appropriate drainage and erosion control measures to protect neighboring properties. All land alteration on properties within the designated floodplain requires a grading permit without exception.(d)Grading permits...shall be required for any of the following activities:(1)A top of hill or hillside cuts or fills greater than ten (10) feet vertical.(2)Any construction activity where the total volume of cut or fill is equal to or greater than one thousand (1,000) cubic yards.

Source: Little Rock Public WorksView official code

Official source re-checked September 7, 2026: no newer edition of the code had been published (publisher’s edition: Code of Ordinances: Supplement 83).

Full Breakdown

Chapter 29 of the city code makes the department of planning and development the gatekeeper for land alteration. A grading permit is required whenever a project cuts or fills 1,000+ cubic yards, involves a hillside cut or fill over 10 vertical feet, or touches designated floodplain, and every permitted project must include drainage and erosion control measures to protect neighboring properties. Plans go through sketch and final grading/drainage review before work starts.

Violations & Fines

Violating chapter 29 draws the general code penalty: a fine up to $1,000 (doubled for repeat offenses), plus up to $500 per day for a continuing violation such as unpermitted grading left unremediated.

Frequently Asked Questions

Does every small residential lot need a grading permit in Little Rock?
No. Properties of 2 acres or less zoned single- or two-family (R1-R4, R7A), or 5 acres or less fronting a residential street, are exempt; grading falls under the building permit instead.
What triggers a mandatory grading permit?
Cut or fill of 1,000+ cubic yards, hillside cuts/fills over 10 vertical feet, tree clearing beyond code limits, or any land alteration inside the designated floodplain.

Sources & Official References

Other rules in Little Rock

All Little Rock rules

Compare Little Rock to another location·View the Arkansas environmental rules overview

Get notified when Stormwater Management in Little Rock, AR changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.