McCracken County, KY Environmental Rules: Stormwater Management (2026)

Some Restrictions
Compiled from the official code textEditor Martyn O'NeillLast verified September 2026

Key Facts

Applies to
All development, countywide outside Paducah, § 150.087
Conveyance design storm
25-year storm for channels, sewers, culverts
Flood check
100-year storm must not overtop roads, § 150.088(B)
Detention basin depth
Max 6 inches deep if in a parking lot
Small-project exemption
5 lots or fewer, no new streets, § 150.092
Design certification
Stamped by a professional civil engineer, § 150.093

Summary

Every new development in unincorporated McCracken County must provide properly sized stormwater conveyance and, where needed, on- or off-site management facilities holding runoff to pre-development levels, designed to a 25-year storm for conveyance and checked against the 100-year storm so water never overtops county roads.

These county ordinances apply to unincorporated areas of McCracken County. Incorporated cities within the county may have their own rules that take precedence over county-level regulations.

§ 150.087 STORM WATER CONVEYANCE AND MANAGEMENT FACILITIES REQUIRED. ... (A) All development occurring within the county shall provide for properly sized storm water conveyance facilities and shall contain on-site, or provide off-site, storm water management facilities capable of controlling increased runoff relative to its predeveloped condition. ... § 150.088 STORM WATER CONVEYANCE FACILITIES DESIGN. (A) The following criteria shall control when designing storm water conveyance facilities; (1) Open channels and roadside ditches: 25-year design storm; (2) Storm sewers and inlets design storm: 25-year design storm; and (3) Entrance pipes and cross drains: 25-year design storm. (B) Maximum headwater under 100-year storm shall not be allowed to overtop roads or increase the flooding potential in the affected areas.

Full Breakdown

Section 150.087, STORM WATER CONVEYANCE AND MANAGEMENT FACILITIES REQUIRED, applies countywide outside Paducah: all development occurring within the county shall provide for properly sized storm water conveyance facilities and shall contain on-site, or provide off-site, storm water management facilities capable of controlling increased runoff relative to its predeveloped condition. No final subdivision plat can be approved, and no permit issued, without a storm water plan or an approved waiver. Section 150.088 then fixes the design storm for conveyance facilities at a 25-year event for open channels and roadside ditches, storm sewers and inlets, and entrance pipes and cross drains alike, while capping the maximum headwater under a 100-year storm so it is not allowed to overtop roads or increase flooding potential in the affected areas.

Section 150.090 governs the management facilities themselves: they must be sized to the difference between pre- and post-development runoff for a 25-year, 24-hour storm, the 100-year storm's effect must be documented, and any detention basin sited in a parking lot cannot be designed to hold water more than six inches deep. Section 150.092 exempts small projects, such as subdivisions with five lots or fewer and no new streets, residential lots over two acres, and nonresidential sites with less than 10,000 square feet of impervious surface, though the Planning Commission may also waive requirements case by case. Section 150.093 requires a professional civil engineer to stamp every design, following the Kentucky Department of Highways drainage manual.

Violations & Fines

Developing land or subdividing without an approved stormwater conveyance and management plan, or without the required waiver under § 150.087, blocks final plat and permit approval outright, and any resulting zoning violation is punishable under § 150.999 by a fine of $10 to $500, up to 30 days imprisonment, or both, per day of violation.

Frequently Asked Questions

Does every new development in the county need a stormwater plan?
Yes, unless it qualifies for an exemption. Section 150.087 requires all development to provide properly sized conveyance facilities and, where runoff would increase, on-site or off-site management facilities, and blocks final subdivision or permit approval until that plan or a documented waiver is in place.
What design storm do county drainage facilities have to handle?
Section 150.088 requires open channels, roadside ditches, storm sewers, inlets, entrance pipes and cross drains to be designed for a 25-year storm event, and separately requires that the maximum headwater under a 100-year storm not overtop roads or worsen flooding in the area.
Is my project exempt from stormwater management?
It may be. Section 150.092 exempts subdivisions of five lots or fewer with no new streets, residential lots or planned developments over two acres, and nonresidential projects with under 10,000 square feet of impervious surface, though the Planning Commission can also grant a waiver in other cases.
Who has to certify the stormwater design?
Section 150.093 requires a professional civil engineer to prepare and stamp the design of all storm water management and conveyance facilities, following the current edition of the Kentucky Department of Highways' drainage design manual, and § 150.094 requires that engineer to certify after construction that the facilities were built as approved.

Sources & Official References

Other rules in McCracken County

All McCracken County rules

Compare McCracken County to another location·View the Kentucky environmental rules overview

Get notified when Stormwater Management in McCracken County, KY changes

We'll email you the moment we detect a change in the code. No spam, unsubscribe anytime.

We'll never sell or share your email. One-click unsubscribe in every email.

See something wrong?

Help us keep this page accurate. If you notice an error or outdated information, let us know.